87% of proposed penalties paid to date, a $7,958 gap.
Source: MSHA violations data, updated weekly.
Inspection activity
MSHA inspections since 2000
51
inspections on record
1,975
inspection hours
12.2
citations per 100 inspection hours
ⓘThis rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
240 citations across 1,975 inspection hours.
Source: MSHA inspections data, updated weekly.
Penalty disposition
ⓘDifferences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$61K
proposed penalties
$53K
current assessed
$53K
paid to date
$0
outstanding
231 assessments are final orders; 3 contested dockets.
As of the most recent assessment on 2009-02-05.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Cortez Gold Mines - (J V) · Caught in, under or between (Not Elsewhere Classified)
AS HE BACKED UP3TO THE BERM TO DUMP HIS LOAD, THE FLOOR OF THE STOCKPILE GAVE WAY AND THE TRUCK WENT DOWN THE FACE OF THE STOCKPILE BACKWARDS AND CAME TO REST ON ITS TOP.
Watch this operator
Email me when a new MSHA incident is filed at any Cortez Gold Mines - (J V) mine.
For insurers, brokers, and safety consultants
The full compliance file on Cortez Gold Mines - (J V)
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and
docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF
with the underlying data as CSV.