← Peru mining record · All Peru sanctions
EMPRESA ADMINISTRADORA CERRO S.A.C.
Peru mining record: safety sanctions, environmental fines and fatal accidents
RUC (tax ID) 20538848060· On record from Oct 2, 2011 to Mar 13, 2026
Appears in the source as: EMPRESA ADMINISTRADORA CERRO S.A.C · EMPRESA ADMINISTRADORA CERRO SAC
ⓘ
A resolution (resolución) is OSINERGMIN's formal written decision closing one sanction case: an order from the regulator, not a court judgment. A single resolution can fine several infractions at once, and it can be appealed to TASTEM, the agency's own appeals tribunal.ⓘ
S/ is the Peruvian sol, Peru's currency. The gray dollar figures are approximate conversions at S/ 3.35 per US$1 (August 2026).ⓘ
The UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles.From Jan 18, 2022 to Mar 13, 2026 · S/ 1,299,797 ≈$388K
Obligation (OSINERGMIN's label)
ⓘThe legal obligation OSINERGMIN found breached, in the agency's own Spanish wording. |
State (OSINERGMIN)
ⓘOSINERGMIN's own per-infraction state, kept verbatim in Spanish: FUNDADA (upheld), FUNDADA EN PARTE (upheld in part), INFUNDADA (dismissed), ARCHIVADA (closed), NULIDAD (annulled), EMITIDA (issued). |
UIT
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
Fines (S/)
ⓘS/ is the Peruvian sol, Peru's currency. The gray dollar figures are approximate conversions at S/ 3.35 per US$1 (August 2026). |
% paid
ⓘThe share of the fine OSINERGMIN reports as paid for this infraction. Whether it reflects collection to date has not been confirmed with the agency. |
|---|---|---|---|---|
| 2.2.11 Sistema de suspensión automática. | ARCHIVADA | 0 | 0 | 0% |
Obligation (OSINERGMIN's label)
ⓘThe legal obligation OSINERGMIN found breached, in the agency's own Spanish wording. |
State (OSINERGMIN)
ⓘOSINERGMIN's own per-infraction state, kept verbatim in Spanish: FUNDADA (upheld), FUNDADA EN PARTE (upheld in part), INFUNDADA (dismissed), ARCHIVADA (closed), NULIDAD (annulled), EMITIDA (issued). |
UIT
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
Fines (S/)
ⓘS/ is the Peruvian sol, Peru's currency. The gray dollar figures are approximate conversions at S/ 3.35 per US$1 (August 2026). |
% paid
ⓘThe share of the fine OSINERGMIN reports as paid for this infraction. Whether it reflects collection to date has not been confirmed with the agency. |
|---|---|---|---|---|
| 2.2.5 Diseño y operación de depósito de relaves y pilas de lixiviación. | INFUNDADA | 4.96 | 27,280 | 0% |
Obligation (OSINERGMIN's label)
ⓘThe legal obligation OSINERGMIN found breached, in the agency's own Spanish wording. |
State (OSINERGMIN)
ⓘOSINERGMIN's own per-infraction state, kept verbatim in Spanish: FUNDADA (upheld), FUNDADA EN PARTE (upheld in part), INFUNDADA (dismissed), ARCHIVADA (closed), NULIDAD (annulled), EMITIDA (issued). |
UIT
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
Fines (S/)
ⓘS/ is the Peruvian sol, Peru's currency. The gray dollar figures are approximate conversions at S/ 3.35 per US$1 (August 2026). |
% paid
ⓘThe share of the fine OSINERGMIN reports as paid for this infraction. Whether it reflects collection to date has not been confirmed with the agency. |
|---|---|---|---|---|
| Incumplir con medidas complementarias, correctivas o preventivas dispuestas, asi como mandatos de carácter particular u otras obligaciones que fueran dispuestas por OSINERGMIN. (modificado por Res 448-2008-OS/CD) | INFUNDADA | 41.11 | 219,939 | 100% |
Obligation (OSINERGMIN's label)
ⓘThe legal obligation OSINERGMIN found breached, in the agency's own Spanish wording. |
State (OSINERGMIN)
ⓘOSINERGMIN's own per-infraction state, kept verbatim in Spanish: FUNDADA (upheld), FUNDADA EN PARTE (upheld in part), INFUNDADA (dismissed), ARCHIVADA (closed), NULIDAD (annulled), EMITIDA (issued). |
UIT
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
Fines (S/)
ⓘS/ is the Peruvian sol, Peru's currency. The gray dollar figures are approximate conversions at S/ 3.35 per US$1 (August 2026). |
% paid
ⓘThe share of the fine OSINERGMIN reports as paid for this infraction. Whether it reflects collection to date has not been confirmed with the agency. |
|---|---|---|---|---|
| 1.1 Autorización de construcción. | EMITIDA | 22.44 | 120,054 | 100% |
| 1.2 Autorización de funcionamiento. | EMITIDA | 80.55 | 430,943 | 100% |
Obligation (OSINERGMIN's label)
ⓘThe legal obligation OSINERGMIN found breached, in the agency's own Spanish wording. |
State (OSINERGMIN)
ⓘOSINERGMIN's own per-infraction state, kept verbatim in Spanish: FUNDADA (upheld), FUNDADA EN PARTE (upheld in part), INFUNDADA (dismissed), ARCHIVADA (closed), NULIDAD (annulled), EMITIDA (issued). |
UIT
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
Fines (S/)
ⓘS/ is the Peruvian sol, Peru's currency. The gray dollar figures are approximate conversions at S/ 3.35 per US$1 (August 2026). |
% paid
ⓘThe share of the fine OSINERGMIN reports as paid for this infraction. Whether it reflects collection to date has not been confirmed with the agency. |
|---|---|---|---|---|
| 1.2 Autorizacion de funcionamiento | INFUNDADA | 52.47 | 288,585 | 0% |
Obligation (OSINERGMIN's label)
ⓘThe legal obligation OSINERGMIN found breached, in the agency's own Spanish wording. |
State (OSINERGMIN)
ⓘOSINERGMIN's own per-infraction state, kept verbatim in Spanish: FUNDADA (upheld), FUNDADA EN PARTE (upheld in part), INFUNDADA (dismissed), ARCHIVADA (closed), NULIDAD (annulled), EMITIDA (issued). |
UIT
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
Fines (S/)
ⓘS/ is the Peruvian sol, Peru's currency. The gray dollar figures are approximate conversions at S/ 3.35 per US$1 (August 2026). |
% paid
ⓘThe share of the fine OSINERGMIN reports as paid for this infraction. Whether it reflects collection to date has not been confirmed with the agency. |
|---|---|---|---|---|
| 2.2.5 Operación de depósitos de relaves y pilas de lixiviación | EMITIDA | 12.12 | 62,418 | 100% |
Obligation (OSINERGMIN's label)
ⓘThe legal obligation OSINERGMIN found breached, in the agency's own Spanish wording. |
State (OSINERGMIN)
ⓘOSINERGMIN's own per-infraction state, kept verbatim in Spanish: FUNDADA (upheld), FUNDADA EN PARTE (upheld in part), INFUNDADA (dismissed), ARCHIVADA (closed), NULIDAD (annulled), EMITIDA (issued). |
UIT
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
Fines (S/)
ⓘS/ is the Peruvian sol, Peru's currency. The gray dollar figures are approximate conversions at S/ 3.35 per US$1 (August 2026). |
% paid
ⓘThe share of the fine OSINERGMIN reports as paid for this infraction. Whether it reflects collection to date has not been confirmed with the agency. |
|---|---|---|---|---|
| 2.2.5 Operación de depósitos de relaves y pilas de lixiviación | INFUNDADA | 30.42 | 150,579 | 100% |
| Year | Resolution
ⓘA resolution (resolución) is OSINERGMIN's formal written decision closing one sanction case: an order from the regulator, not a court judgment. A single resolution can fine several infractions at once, and it can be appealed to TASTEM, the agency's own appeals tribunal. |
Sanctioned party as written | Type | TASTEM ruling |
|---|---|---|---|---|
| Dec 18, 2017 | 2472-2017-OS-GSM | EMPRESA ADMINISTRADORA CERRO S.A.C. | 129-2018-OS-TASTEM-S2 | |
| Jun 21, 2016 | 1884-2016-OS-GSM hidden on the agency's page | EMPRESA ADMINISTRADORA CERRO S.A.C. | ||
| Nov 30, 2015 | Resolution (PDF) | EMPRESA ADMINISTRADORA CERRO SAC | ||
| Nov 17, 2015 | Resolution (PDF) | EMPRESA ADMINISTRADORA CERRO S.A.C. | ||
| Sep 22, 2015 | Resolution (PDF) | EMPRESA ADMINISTRADORA CERRO S.A.C. | ||
| Jul 3, 2015 | Resolution (PDF) hidden on the agency's page | EMPRESA ADMINISTRADORA CERRO S.A.C. | 239-2015-OS/TASTEM-S2 | |
| Dec 12, 2012 | 17671-2012-OS-GG | EMPRESA ADMINISTRADORA CERRO S.A.C | 013-2013-OS-TASTEM-S2 |
The regulator's own list, frozen in December 2019. It publishes no fine amount: the resolution PDF is the record. A row naming a titleholder and a contractor together is shown as written.
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Eficacia de la fiscalización
El administrado obstaculizó las labores de supervisión del OEFA, al no permitir el normal desarrollo de la acción de supervisión a los supervisores designados, a fin de verificar los componentes y las áreas ubicadas al interior de la unidad fiscalizable Cerro de Pasco
|
6.54 |
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Abandono o remediación ambiental
Los titulares mineros no ejecutaron los siguientes programas sociales: (i) incorporación de las comunidades locales, principalmente aquellas más cercanas al Delta, como son Vicco y Cochamarca, dentro de las actividades de cierre, es decir la contratación de trabajadores dentro de las propias comunidades; (ii) encuestas de opinión de las comunidades cercanas al sitio (Yurajhuanca y Quiulacocha) para establecer si las medidas tomadas han producido alguna modificación negativa o positiva en el entorno, cuyo plazo para ejecución era hasta 18 de marzo de 2018, incumpliendo lo establecido en su instrumento de gestión ambiental
|
293.91 |
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Excesos de Límites Máximos Permisibles y/o ECAS
El administrado excedió los Límites Máximos Permisibles (LMP) respecto al parámetro Zinc en el punto de muestreo EO-01, ubicado en las coordenadas UTM WGS84, Zona 8 816 970 N 358 922 E
|
10.19 |
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Actividades, componentes y/o equipos no declarados
El administrado no realizó el desplazamiento de la poza (celda N° 1) del depósito de relaves Ocroyoc hacia la margen izquierda del referido depósito de relaves, incumpliendo lo establecido en su instrumento de gestión ambiental.
|
55.69 |
|
Excesos de Límites Máximos Permisibles y/o ECAS
El administrado excedió los Límites Máximos Permisibles respecto del parámetro cianuro total (Cn) en el punto de muestreo ESP-2, correspondiente al efluente que proviene del espejo de agua del depósito de relaves Ocroyoc y descarga en el río Ragra.
|
9.85 |
|
Residuos Sólidos
El administrado no realizó un adecuado manejo de los residuos sólidos domésticos, generados en los campamentos Esperanza y Railway
corrective measure ordered
|
5.18 |
|
Actividades, componentes y/o equipos no declarados
El administrado implementó, como parte del sistema de bombeo del depósito de desmonte Rumiallana, los siguientes componentes: (i) poza de contención (poza N° 3) y (ii) poza de captación de filtraciones (poza auxiliar N° 4), los mismos que no están contemplados en sus instrumentos de gestión ambiental.
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Compromisos y/o normas ambientales simples
El administrado no ejecutó de manera inmediata las medidasde mantenimiento, control y optimización de los sistemas de abastecimiento de agua para consumo humano Garga y Paragsha, priorizando la dosificación de cloro, a fin de controlar los parámetros microbiológicos, cuya cantidad debía estar conforme a lo establecido en el Reglamento de calidad de Agua para consumo Humano, aprobado mediante Decreto Supremo N° 031-2010-SA, incumpliendo lo dispuesto en el artículo 1° de la Resolución Directoral N° 055-2018-OEFA/DSEM.
|
127.80 |
|
Compromisos y/o normas ambientales simples
El administrado no ejecutó de manera inmediata las medidas de mantenimiento de los sistemas de bombeo de agua para consumo humano Garga y Paragsha, a fin de controlar la presencia de los parámetros microbiológicos en dicha agua, incumpliendo lo dispuesto en el artículo 1° de la Resolución Directoral N° 055-2018-OEFA/DSEM
|
63.75 |
|
Monitoreos ambientales
El administrado no realizó, como parte de las medidas de mantenimiento, control y optimización de los sistemas de abastecimiento de agua para consumo humano Garga y Paragsha, el monitoreo diario, por un período de 10 días, del agua que abastece a la población, con el fin de analizar los parámetros Microbiológicos, Parasitológicos y cloro residual libre conforme a los anexos I y III del Reglamento de calidad de Agua para consumo humano, aprobado mediante Decreto Supremo N° 031-2010-SA, incumpliendo lo dispuesto en el artículo 1° de la Resolución Directoral N° 055-2018-OEFA/DSEM
|
21.13 |
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Compromisos y/o normas ambientales simples
El administrado no realizó la cloración en el tanque Uliachin, toda vez que las aguas provenientes de los reservorios Paragsha, y del Tanque Uliachin excedieron en el parámetro de coliformes totales; incumpliendo con el compromiso ambiental de brindar agua apta para consumo humano a las poblaciones de Bellavista, Paragsha y Uliachin, entre otras.
|
12.33 |
|
Compromisos y/o normas ambientales simples
El administrado no ejecutó las medidas de estabilidad física referidas al relleno del Rajo RP-213 y el desquinche de 1m manteniendo un talud de corte en 3:1 (V:H), incumpliendo lo establecido en su instrumento de gestión ambiental.
|
9.16 |
|
Adopción de medidas de previsión y control ambiental
El administrado no implementó las medidas de prevención y control a fin de evitar la presencia de material con potencial generador de drenaje ácido en el canal de derivación -ubicado en el interior del Rajo RP-219- y en un área de aproximadamente 678m2 ubicada en la parte final del Rajo.
La RTFA 0025-2021-OEFA/TFA-SE revoca el extremo referido a los 678 m2
|
8.20 |
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Residuos Sólidos
El administrado no realizó las acciones descritas en el plan de gestión del depósito de desmonte Rumiallana respecto a la disposición adecuada de los residuos sólidos domésticos generados por la ciudad de Cerro de Pasco, incluido en su instrumento de gestión ambiental; en lo referente a: i) realizar el esparcido y coberturado de los residuos sólidos ii) realizar la compactación de los residuos sólidos con la con la ayuda de un rodillo vibrador y/o tractor de oruga y iii) la conformación de plataformas
|
36.84 |
|
Manejo de efluentes
El administrado no realizó el manejo adecuado del agua clarificada del depósito de relaves Ocroyoc, en lo referente a conducirla hacia un tanque de almacenamiento para luego ser derivada hacia las plantas concentradoras Paragsha y San Expedito; en tanto estaría derivando dicha agua clarificada hacia una planta de tratamiento, para posteriormente ser descargada en el rio Ragra, en el punto con coordenadas UTM WGS84: 8816967N 358917E, incumplimiento así lo previsto en su instrumento de gestión ambiental
corrective measure ordered
|
29.19 |
|
Compromisos y/o normas ambientales simples
El administrado no realizó la canalización y derivación de las aguas de escorrentía superficial proveniente del botadero Rumiallana hasta la planta de tratamiento de aguas ácidas (Planta de Neutralización), toda vez que, se detectó un canal para la colección y derivación del agua de contacto del depósito de desmonte Rumiallana que se conecta con un dren francés, en el punto con coordenadas UTM WGS 84: 361874E, 8820608N, y deriva el agua de escorrentía a través del rio Tingo, incumpliendo lo establecido en su instrumento de gestión ambiental
|
24.89 |
|
Residuos Sólidos
El administrado dispuso los residuos sólidos industriales y peligrosos en el interior del Tajo Abierto Raúl Rojas, incumpliendo lo previsto en su instrumento de gestión ambiental
corrective measure ordered
|
9.85 |
|
Abandono o remediación ambiental
El administrado no implementó las medidas de cierre progresivo establecidas en la APCM Cerro de Pasco 2012, para los siguientes pasivos ambientales: i) Bocamina BP-252, ii) Media barreta MP-212, iii) Cateo CP-212, iv) Rajo RP-95, v) Rajo RP-213, vi) Rajo RP-219, vii) Desmontera P-18-D, viii) Desmontera P-94-D, ix) Desmontera P-95-D, x) Desmontera P-113-D, xi) Desmontera P-124-D, xii) Desmontera P-125-D, xiii) Desmontera P-252-D, y xiv) Infraestructura IP-01, incumpliendo lo previsto en su instrumento de gestión ambiental
*Se archiva en el extremo que el administrado no implemento las medidas de cierre en Bocamina BP-252
corrective measure ordered
|
4.25 |
|
Compromisos y/o normas ambientales simples
El administrado no cumplió con la obligación socioambiental del Programa de Desarrollo Local - Actividades de Apoyo a la Educación en lo referente a otorgar becas de estudio integrales a los alumnos de las instituciones educativas pertenecientes a las Comunidades y Localidades de Paragsha y Yurajhuanca que ocuparon el primer puesto al culminar la secundaria en carreras afines a la actividad minera, correspondiente al año 2016.
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Adopción de medidas de previsión y control ambiental
El administrado no adoptó las medidas de prevención y control que eviten o impidan el afloramiento y acumulación de agua con caracterización ácida y elevada concentración de elementos metálicos en el rajo RP- 213 (en las coordenadas UTM WGS-84: 359706E, 8823474N) y en el rajo RP-219 (en las coordenadas UTM WGS-84: 359 907 E, 8 823 289N; y, 359926E, 8823275N), donde adicionalmente se infiltraba y discurría a través de un canal de tierra en dirección a una quebrada sin nombre
|
111.43 |
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Excesos de Límites Máximos Permisibles y/o ECAS
Los administrados excedieron los Límites Máximos Permisibles respecto de los parámetros potencial de hidrógeno (pH), sólidos totales suspendidos (STS), arsénico total (As), cobre total (Cu) y zinc total (Zn) en el punto de muestreo identificado como ESP- 1
|
62.29 |
|
Excesos de Límites Máximos Permisibles y/o ECAS
Los administrados excedieron los Límites Máximos Permisibles respecto de los parámetros potencial de hidrógeno (pH), sólidos totales suspendidos (STS), arsénico total (As), cobre total (Cu) y zinc total (Zn) en el punto de muestreo identificado como ESP- 1
|
62.29 |
|
Compromisos y/o normas ambientales simples
Los administrados no implementaron el tratamiento de sedimentación y cloración del agua para consumo humano, en los tanques de Paragsha y Garga (Uliachin), para la distribución a la población de Paragsha y otras, hasta que la planta de tratamiento de agua potable de EMAPA Pasco opere al 100% de su capacidad, incumpliendo sus instrumentos de gestión ambiental.
|
24.35 |
|
Compromisos y/o normas ambientales simples
Los administrados no implementaron el tratamiento de sedimentación y cloración del agua para consumo humano, en los tanques de Paragsha y Garga (Uliachin), para la distribución a la población de Paragsha y otras, hasta que la planta de tratamiento de agua potable de EMAPA Pasco opere al 100% de su capacidad, incumpliendo sus instrumentos de gestión ambiental.
|
24.35 |
|
Adopción de medidas de previsión y control ambiental
Los administrados no ejecutaron programas regulares de inspección y mantenimiento preventivo de las instalaciones de la estación de bombeo Yurajhuanca, asimismo, no cuentan con un registro actualizado de estas actividades, incumpliendo lo establecido en la normativa ambiental.
|
21.68 |
|
Adopción de medidas de previsión y control ambiental
Los administrados no ejecutaron programas regulares de inspección y mantenimiento preventivo de las instalaciones de la estación de bombeo Yurajhuanca, asimismo, no cuentan con un registro actualizado de estas actividades, incumpliendo lo establecido en la normativa ambiental.
|
21.68 |
|
Incumplimientos formales
Empresa Administradora Cerro S.A.C. no presentó al OEFA de manera completa la información solicitada mediante requerimiento documentario que forma parte del Acta de Supervisión, incumpliendo lo establecido en la normativa ambiental
|
3.65 |
|
Incumplimientos formales
Empresa Administradora Cerro S.A.C. no presentó al OEFA de manera completa la información solicitada mediante requerimiento documentario que forma parte del Acta de Supervisión, incumpliendo lo establecido en la normativa ambiental
|
3.65 |
|
Manejo de efluentes
Los administrados no implementaron medidas de manejo para minimizar la existencia de infiltraciones de agua ácida hacia el suelo ubicado adyacente al depósito de desmonte Hanancocha y el depósito de desmonte Stock piles (denominado aeropuerto), incumpliendo lo establecido en la normativa ambiental
|
|
|
Manejo de efluentes
Los administrados no implementaron medidas de manejo para minimizar la existencia de infiltraciones de agua ácida hacia el suelo ubicado adyacente al depósito de desmonte Hanancocha y el depósito de desmonte Stock piles (denominado aeropuerto), incumpliendo lo establecido en la normativa ambiental
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Eficacia de la fiscalización
El administrado no implementó un sistema de control de la dispersión del material particulado en el depósito de desmontes Miraflores, de manera que evite que el material particulado llegue al Parque Infantil Ecológico Paragsha, incumpliendo lo dispuesto en la medida preventiva dictada en el artículo 1° de la Resolución Directoral N° 007-2017- OEFA/DS
|
|
|
Eficacia de la fiscalización
El administrado no implementó un cerco perimétrico hacia el lado que colinda el Depósito de Desmonte Miraflores con el Parque Infantil Ecológico Paragsha, a fin de evitar el ingreso de personas a dicho componente incumpliendo lo dispuesto en la medida preventiva dictada en el artículo 2° de la Resolución Directoral N° 007 2017-OEFA/DS
|
|
|
Eficacia de la fiscalización
El administrado no retiró el suelo del Parque Infantil Ecológico Paragsha, incumpliendo lo dispuesto en la medida preventiva dictada en el artículo 3° de la Resolución Directoral N° 007-2017-OEFA/DS
|
|
|
Eficacia de la fiscalización
El cronograma presentado por el administrado para la ejecución de las actividades señaladas en los artículos 1, 2 y 3 de la Resolución Directoral N° 007-2017 OEFA/DS, no contempla las medidas para ejecutar el retiro (limpieza) del suelo del Parque Ecológico de Paragsha, asimismo, los plazos previstos para ejecutar las actividades programadas exceden los plazos establecidos en el artículo 4° de la Resolución Directoral N° 007-2017-OEFA/DS
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Actividades, componentes y/o equipos no declarados
El administrado realizó perforaciones de tipo RC19 en el Botadero de Desmonte Rumiallana, actividad no establecida en su instrumento de gestión ambiental
corrective measure ordered
|
17.41 |
|
Residuos Sólidos
El administrado no realizó el manejo seguro, sanitario y ambientalmente adecuado de los residuos sólidos domésticos, en el Campamento 1° de Mayo que forma parte de la Unidad Minera Cerro de Pasco, incumpliendo la normativa de Residuos Sólidos.
corrective measure ordered
|
8.02 |
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Abandono o remediación ambiental
El titular minero no ejecutó las actividades de cierre progresivo del pasivo ambiental Media Barreta MP-212, incumpliendo lo establecido en su instrumento de gestión ambiental
|
|
|
Manejo de efluentes
El titular minero no realizó el tratamiento del caudal correspondiente al 140 l/s – 150 l/s de agua ácida proveniente de las operaciones de la unidad minera Cerro de Pasco (entre 140 y 150 l/s) a través de la Planta de Neutralización debido a la paralización de ésta, incumpliendo
su instrumento de gestión ambiental.
corrective measure ordered
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Incumplimientos formales
Administradora Cerro remitió los informes semestrales correspondiente al período 2014 - II de manera incompleta respecto al avance de las labores de rehabilitación señaladas en el Plan de Cierre de Minas, así como de aquellas actividades de cierre comprometidas para el semestre inmediato posterior
|
|
|
Incumplimientos formales
Administradora Cerro remitió los informes semestrales correspondiente al período 2015 - I de manera incompleta respecto al avance de las labores de rehabilitación señaladas en el Plan de Cierre de Minas, así como de aquellas actividades de cierre comprometidas para el semestre inmediato posterior
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Compromisos y/o normas ambientales simples
El titular minero no habría implementado la estación de bombeo que colecta el agua de filtración proveniente del depósito de relaves Ocroyoc y su derivación al espejo de agua de la relavera, incumpliendo lo establecido en su instrumento ambiental .
corrective measure ordered
|
|
|
Adopción de medidas de previsión y control ambiental
El titular minero no habría adoptado las medidas de previsión y control que eviten e impidan el contacto directo de restos de cal al interior del canal de coronación del lado izquierdo del depósito de relaves Ocroyoc, ubicado en las coordenadas UTM WGS 84: 359134E, 8817613N, de acuerdo a la normativa ambiental .
|
|
|
Adopción de medidas de previsión y control ambiental
El titular minero no habría adoptado las medidas de previsión y control que eviten e impidan el contacto de relave con el suelo, debido a la rotura de la tubería de la línea de conducción de relave ubicada en las coordenadas UTM WGS 84 360417E, 8818209N, incumpliendo la normativa ambiental .
corrective measure ordered
|
|
|
Manejo de efluentes
El titular minero descarga en el río Ragra agua proveniente del espejo del depósito de relaves Ocroyoc, ubicado en las coordenadas UTM WGS84 358925E, 8816971N, incumpliendo lo establecido en su instrumento de gestión ambiental .
corrective measure ordered
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Adopción de medidas de previsión y control ambiental
El titular minero remitió el informe semestral del Plan de Cierre de Minas correspondiente al primer semestre del 2016 de manera incompleta, respecto de los siguientes componentes: bocamina BP-252, bocamina BP-18 y Media Barreta MP-212.
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Manejo de efluentes
Supervisión Especial 2015-II
El titular minero derivó agua ácida proveniente del depósito de relaves Quiulacocha a la planta de neutralización de agua ácida del sector Pampa Seca, incumpliendo lo dispuesto en su instrumento de gestión ambiental
corrective measure ordered
|
|
|
Actividades, componentes y/o equipos no declarados
Supervisión Especial 2015-II
El titular minero implementó la planta de tratamiento de agua residual Ocroyoc, la cual no se encuentra contenida en sus instrumentos de gestión ambiental .
corrective measure ordered
|
|
|
Compromisos y/o normas ambientales complejas
Supervisión Especial 2016
El titular minero no implementó un sistema de captación del agua ácida proveniente del Stock Pile 7D para derivarla hacia la planta de neutralización de agua ácida, incumpliendo lo dispuesto en su instrumento de gestión ambiental
corrective measure ordered
|
|
|
Compromisos y/o normas ambientales complejas
Supervisión Especial 2016
El titular minero no adoptó las medidas de previsión y control que eviten o impidan que el agua ácida proveniente del afloramiento en la parte baja de la estación de ferrocarril “Depósito Paul Cureña, discurra por el suelo e ingrese al canal que conduce el agua del río Ragra
corrective measure ordered
|
|
|
Residuos Sólidos
Supervisión Regular 2016
El titular minero no realizó un adecuado acondicionamiento de sus residuos sólidos peligrosos en las cámaras de bombeo de mina
corrective measure ordered
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Compromisos y/o normas ambientales complejas
Administradora Cerro deberá realizar la revegetación del Depósito de Desmonte Miraflores, específicamente en el área que colinda con la población (parque ecológico infantil Paragsha).
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Adopción de medidas de previsión y control ambiental
El titular minero no adoptó medidas de previsión y control que eviten e impidan la presencia de sedimentos en el río Ragra
corrective measure ordered
|
25.93 |
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Compromisos y/o normas ambientales simples
El titular minero no habría realizado el riego continuo de la carretera del depósito de desmonte Rumiallana, conforme a lo establecido en su instrumento de gestión ambiental, generando así la emisión de material particulado como consecuencia del paso de los camiones que transportan mineral.
corrective measure ordered
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Abandono o remediación ambiental
El titular minero no habría realizado la instalación de un cerco perimétrico ni las medidas de rehabilitación del área colindante a la laguna Yanamate (coordenadas UTM WGS84 363034 E; 8815673 N), incumpliendo su plan de cierre de minas.
corrective measure ordered
|
| Infraction (OEFA's classification) | Fine (UIT)
ⓘThe UIT (Unidad Impositiva Tributaria) is Peru's tax reference unit, revalued each year. OSINERGMIN states every fine in UIT as well as in soles. |
|---|---|
|
Compromisos y/o normas ambientales simples
El titular minero no ejecutó los trabajos de disposición del sistema de operación del botadero Rumiallana, incumpliendo su instrumento de gestión ambiental.
corrective measure ordered
|
|
|
Emergencias ambientales
En la línea de conducción de relaves de la Planta Concentradora San Expedito que va desde la zona de Pampa Seca hasta el Depósito de relaves Ocroyoc no se implementó un sistema de contingencia para casos de derrame de relaves.
corrective measure ordered
|
From OEFA's environmental infractions register (RUIAS), mining subsector, snapshot cut April 30, 2024. Fines are in UIT, Peru's yearly-revalued tax unit, as OEFA states them; a case can carry several infraction lines and a corrective measure instead of a fine.
| Date of death | Mining unit | Accident type (as classified) | Place | Category |
|---|---|---|---|---|
| Oct 2, 2011 | CERRO DE PASCO | DESPRENDIMIENTO DE ROCAS | SIMON BOLIVAR, PASCO, PASCO | Gran y Mediana Minería |
One row per death from the Ministry of Energy and Mines' open-data list, naming the titleholder and mining unit. The file has no 2019 rows and only 10 for 2017-2018, an upstream gap; deaths after June 2021 are not in it.