EMP WAS REPARING THE HYDRAULIC FEED LINE OF LIFT CYLINDER . THE BUCKET MUST BE RAISED TO REPAIR THIS LINE. EMP SUPPORTED THE BUCKET WITH 6 X 8" TIMBER TO PERFORM THE REPAIR TASK. THE TIMBER SP LIT LENGTH WAYS ALLOWING THE BUCKET TO FALL CRUSHING THE MEP BETWEEN THE BOOM AND MUCKER FRAM E
Alta Gold Company: 1 recorded fatality controller
Watch this controller
Email me when a new MSHA incident is filed at any mine Alta Gold Company controls.
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.ⓘ
This rate is reportable injury cases per 100 full-time-equivalent workers per year, computed as 200,000 times cases divided by MSHA operator-reported employee-hours. Cases are injuries MSHA graded degree 01 through 07; accident-only events that hurt no one are excluded, and so are contractor injuries, whose hours do not attach to a single mine. Rates begin in 2000, when quarterly employment reporting starts, and are withheld below 20,000 hours in a year.Top causes
- FALLING/SLIDING/ROLLING MATERIALS 1 fatality
- SLIP OR FALL OF PERSON 52 non-fatal
- HANDLING OF MATERIALS 47 non-fatal
- MACHINERY 36 non-fatal
- HANDTOOLS (NONPOWERED) 30 non-fatal
- POWERED HAULAGE 29 non-fatal
Incident timeline
Operators under this controller
Mines on record
Fatalities under this controller
1 recordedWhere Alta Gold Company stands on silica, penalties, and injury rate
MSHA's standard limits respirable silica to 50 micrograms per cubic metre, but MSHA publishes dust and quartz as separate files and never the silica figure itself. We derive it per sample, score it against the limit, and set the operator's injury rate against a benchmark built from the full MSHA operator record. With the 26-year penalty trail, contest posture, and fatality history. Delivered as a PDF with the underlying data as CSV.
The federal record itself stays free on this site. What costs money, and why.