76% of proposed penalties paid to date, a $4,000 gap.
Source: MSHA violations data, updated weekly.
Inspection activity
MSHA inspections since 2001
20
inspections on record
388
inspection hours
n/a
citations per 100 inspection hours
ⓘThis rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
Rate withheld: 388 inspection hours is too few for a stable rate. A minimum of 1,000 inspection hours is required.
Source: MSHA inspections data, updated weekly.
Penalty disposition
ⓘDifferences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$17K
proposed penalties
$13K
current assessed
$13K
paid to date
$0
outstanding
28 assessments are final orders; 1 contested dockets.
As of the most recent assessment on 2005-11-09.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
January 14, 2002GA · Metal/Non-Metalmine manager, mine foreman, mine ownerFatality · SLIP OR FALL OF PERSON
Worley Blue Quarry · Fall to lower level, (Not Elsewhere Classified)
LEDGE FOREMAN AND HIS LEDGE CREW WERE REMOVING STONE & DEBRIS FROM A BENCH LEVEL AT THE QUARRY SITE. THEY HAD REMOVED THE RAILING AND APPROXIMATELY HALF THE BENCH LEVEL AT THE TIME HE FELL 28 ' TO THE FLOOR BELOW THEM. HE PASSED AWAY 2/1/02.
Watch this operator
Email me when a new MSHA incident is filed at any Worley Blue Quarry mine.
For insurers, brokers, and safety consultants
The full compliance file on Worley Blue Quarry
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and
docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF