Caught in, under or between a moving and a stationary object
EXCAVATOR WAS POSITIONED ON TOP OF EMBANKMENT WITH TRACKS LONGITUDINALLY WITH BANK. BANK GAVE OU TIPPING EXCAVATOR ON OPERATOR SIDE OF MACHINE.
EXCAVATOR WAS POSITIONED ON TOP OF EMBANKMENT WITH TRACKS LONGITUDINALLY WITH BANK. BANK GAVE OU TIPPING EXCAVATOR ON OPERATOR SIDE OF MACHINE.
Typical construction conditions, surface was uneven and rough. EE unclipped harness to converse with the drill foreman. He lost his footing on the rough surface and fell approximately 30' off the ledge.