Mining Incidents

Crusher LU130: 49 MSHA citations Metal/Non-Metal

Laredo Paving Inc · Surface
Controlled by Summit Materials LLC
GARDEN CITY, Glasscock County, TX  ·  Abandoned
MSHA Mine ID: 4104027

Crusher LU130 has $11K in proposed MSHA penalties and $0 outstanding across 5 contested dockets, plus health sampling and the full incident record.

Watch this mine

Email me when a new MSHA incident is filed at Crusher LU130.

Fatalities
0
Total incidents
1
Years on record
2016
Latest incident
Jul 2016
Compliance record
MSHA citations since 2000
49
citations
18
significant & substantial
$10,889
proposed penalties
$8,805
paid to date
81% of proposed penalties paid to date, a $2,084 gap.
Source: MSHA violations data, updated weekly.
Inspection activity
MSHA inspections since 2000
28
inspections on record
426
inspection hours
n/a
citations per 100 inspection hours
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
Rate withheld: 426 inspection hours is too few for a stable rate. A minimum of 1,000 inspection hours is required.
Source: MSHA inspections data, updated weekly.

Crusher LU130 has $11K in proposed MSHA penalties and $0 outstanding across 5 contested dockets.

Penalty disposition
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$11K
proposed penalties
$9K
current assessed
$9K
paid to date
$0
outstanding
48 assessments are final orders; 5 contested dockets.
Of $5K in penalties contested before the Commission, $3K was upheld in final decisions.
As of the most recent assessment on 2014-08-05.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Violation severity profile
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.
37.5%
significant & substantial
16.7%
high negligence or reckless
39.6%
reasonably likely or greater
62.5%
permanently disabling or fatal if injury occurs
Negligence coding: 0.0% none, 2.1% low, 81.2% moderate, 16.7% high, 0.0% reckless.
Source: MSHA violations gravity and negligence coding, updated weekly.
When citations were contested
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.
15 citations taken to the federal commission · 31% of citations on record
  • Settled 15 · 100%
77%
S&S designation survived the contest
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.
of 13 decided S&S contests · industry: 79%
40%
Penalty reduction in decided contests
$5K proposed, $3K after decisions · industry: 39%
Source: MSHA Contested Violations file (public record), updated weekly. A dismissed or defaulted contest leaves the citation standing as issued; a vacated or withdrawn citation is removed from the violation record. Latest contest filed 2014-10-07.
Contested penalties
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.
Largest penalties this mine contested before the Federal Mine Safety and Health Review Commission, with the outcome on record.
Docket Decision Judge Year Proposed / upheld
CENT 2011-647M Settlement Paez 2012 $3K → $2K
CENT 2013-44M Settlement Gill 2013 $1K → $100
CENT20030035M Settlement Lesnick 2004 $736 → $484
CENT 2011-1199M Settlement Lesnick 2012 $285 → $285
CENT 2015-0006 Settlement McCarthy 2015 $208 → $208
Source: FMSHRC civil penalty dockets and decisions (public record), updated weekly.
Health sampling
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.

Metal and nonmetal contaminants (personal samples)
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.

Last sampled: 2012-07-11, 14 years ago
0%
of limit-tested samples over the exposure limit
12
samples
5
limit-tested
Most sampled contaminants
  • Respirable dust, <.1mg6
  • Quartz, respirable, >1% Qtz3
  • Nuisance dust, respirable, <1% Qtz2
  • Unlisted Particulate, respirable, <1% Qtz1
Show the individual readings (12)
Date Contaminant Concentration Limit Conc / limit Occupation
2012-07-11 Unlisted Particulate, respirable, <1% Qtz 0.15 Front-end Loader Operator
2012-07-11 Respirable dust, <.1mg 0 Front-end Loader Operator
2012-07-11 Respirable dust, <.1mg 0 Front-end Loader Operator
2009-11-17 Respirable dust, <.1mg 0 Front-end Loader Operator
2009-11-17 Quartz, respirable, >1% Qtz 1.99 2.92 0.68 Crusher Oper/Worker
2009-11-17 Nuisance dust, respirable, <1% Qtz 0.14 10 0.01 Front-end Loader Operator
2002-07-10 Respirable dust, <.1mg 0 Truck Driver
2002-07-10 Respirable dust, <.1mg 0 Crusher Oper/Worker
2002-07-10 Respirable dust, <.1mg 0 Truck Driver
2001-05-16 Quartz, respirable, >1% Qtz 1.72 2.69 0.64 Dry Screen Plant Operator
2001-05-16 Nuisance dust, respirable, <1% Qtz 0.24 10 0.02 Front-end Loader Operator
2001-05-16 Quartz, respirable, >1% Qtz 0.63 2.55 0.25 Drill Operator, Rotary
Source: MSHA respirable dust, quartz, and noise sampling records, updated weekly. Metal/nonmetal contaminant figures come from MSHA's Personal Health Samples and Area Samples files (public record), updated weekly.
Ownership history
  1. Laredo Paving Inc 1998 to present
Source: MSHA controller and operator history, updated weekly.
Workforce and production
Year Employees
2017 3
2016 4
2015 0
2014 3
2013 4
2012 3
2011 5
2010 6
2009 5
2008 5
2007 5
2006 5
2005 7
2004 3
2003 6
2002 4
2001 7
2000 10
Source: MSHA quarterly employment and production, updated weekly.

Crusher LU130 sits in Glasscock County, Texas, where the Census mining category is 1.3% of county employment.

Local economic context
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.
Glasscock County, Texas · Population 1,070
1.3%
Mining share of county employment
$106,806
Median household income
Source: US Census Bureau, American Community Survey 2023 5-year estimates.
Quarterly safety rates
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.
Citations per million employee-hours, as reported to MSHA
Quarter Hours worked Citations S&S Per 1M hrs
2017 Q2 30 0 0 0.0
2017 Q1 55 0 0 0.0
2016 Q4 605 0 0 0.0
2016 Q3 1,443 1 0 693.0
2016 Q2 778 0 0 0.0
2015 Q4 0 0 0
2015 Q3 0 0 0
2015 Q2 0 0 0
Show 55 earlier quarters
Quarter Hours worked Citations S&S Per 1M hrs
2015 Q1 0 0 0
2014 Q4 0 0 0
2014 Q3 131 3 0 22900.8
2014 Q2 1,260 0 0 0.0
2014 Q1 60 0 0 0.0
2013 Q1 901 6 1 6659.3
2012 Q4 0 1 0
2012 Q3 656 4 0 6097.6
2012 Q2 572 0 0 0.0
2012 Q1 970 2 0 2061.9
2011 Q4 1,852 0 0 0.0
2011 Q2 4,841 0 0 0.0
2010 Q4 4,188 0 0 0.0
2010 Q3 3,101 0 0 0.0
2010 Q2 1,905 0 0 0.0
2009 Q4 284 9 4 31690.1
2009 Q3 445 0 0 0.0
2009 Q2 688 0 0 0.0
2009 Q1 358 0 0 0.0
2008 Q4 1,748 2 0 1144.2
2008 Q3 2,216 0 0 0.0
2008 Q2 1,139 0 0 0.0
2008 Q1 1 0 0 0.0
2007 Q4 461 0 0 0.0
2007 Q3 2,079 0 0 0.0
2007 Q2 1,677 0 0 0.0
2007 Q1 1,772 0 0 0.0
2006 Q4 1,932 0 0 0.0
2006 Q3 2,240 0 0 0.0
2006 Q2 2,887 0 0 0.0
2006 Q1 2,094 0 0 0.0
2005 Q4 2,208 0 0 0.0
2005 Q3 2,558 0 0 0.0
2005 Q2 3,824 0 0 0.0
2005 Q1 3,619 0 0 0.0
2004 Q4 0 0 0
2004 Q3 1,789 0 0 0.0
2004 Q2 1,322 3 1 2269.3
2004 Q1 1,654 0 0 0.0
2003 Q4 2,867 0 0 0.0
2003 Q3 4,831 1 0 207.0
2003 Q2 3,120 0 0 0.0
2003 Q1 1,429 0 0 0.0
2002 Q4 1,868 0 0 0.0
2002 Q3 385 0 0 0.0
2002 Q2 4,005 0 0 0.0
2002 Q1 2,740 0 0 0.0
2001 Q4 1,871 0 0 0.0
2001 Q3 4,278 0 0 0.0
2001 Q2 4,015 8 6 1992.5
2001 Q1 1,684 0 0 0.0
2000 Q4 4,147 0 0 0.0
2000 Q3 5,377 0 0 0.0
2000 Q2 5,969 1 0 167.5
2000 Q1 3,075 0 0 0.0
No fatalities recorded at this mine.

Reportable incidents

1 on file

2016 · 1 incident

July 25, 2016 TX · Metal/Non-Metal laborer, blacksmith, bull gang, parts runner, roustabout, pick-up man, pitman OTHER
Laredo Paving Inc · Unclassified, insufficient data

The day was hot and clear. No equipment was involved in the incident. An employee was discovered unresponsive in port-a-potty. EMS was called. Employee was taken to the ER.