citations per 100 inspection hours
ⓘThis rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
Rate withheld: 349 inspection hours is too few for a stable rate. A minimum of 1,000 inspection hours is required.
Source: MSHA inspections data, updated weekly.
ELSINORE PIT has $2K in proposed MSHA penalties and $0 outstanding across 0 contested dockets.
Penalty disposition
ⓘDifferences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$2K
proposed penalties
$2K
current assessed
$2K
paid to date
$0
outstanding
19 assessments are final orders; 0 contested dockets.
As of the most recent assessment on 2020-11-03.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
Violation severity profile
ⓘShares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.
Source: MSHA violations gravity and negligence coding, updated weekly.
Health sampling
ⓘA sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.
Metal and nonmetal contaminants (personal samples)
ⓘMany samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.
Last sampled: 2025-06-23
20%
of limit-tested samples over the exposure limit
10
samples
5
limit-tested
Most sampled contaminants
Quartz, respirable, >1% Qtz61 over
Respirable dust, <.1mg4
Show the individual readings (10)
Date
Contaminant
Concentration
Limit
Conc / limit
Occupation
2010-04-14
Quartz, respirable, >1% Qtz
1.16
0.58
2.00
Laborer, Bullgang
2025-06-23
Quartz, respirable, >1% Qtz
0.19
Front-end Loader Operator
2022-09-23
Respirable dust, <.1mg
0
Front-end Loader Operator
2018-10-11
Respirable dust, <.1mg
0
Front-end Loader Operator
2018-10-11
Respirable dust, <.1mg
0
Supervisor, Co. Official
2011-10-13
Respirable dust, <.1mg
0
Front-end Loader Operator
2010-06-02
Quartz, respirable, >1% Qtz
0.34
0.76
0.45
Laborer, Bullgang
2010-04-14
Quartz, respirable, >1% Qtz
0.22
1.25
0.18
Front-end Loader Operator
2010-04-14
Quartz, respirable, >1% Qtz
0.14
0.68
0.21
Crusher Oper/Worker
2010-04-14
Quartz, respirable, >1% Qtz
0.27
0.82
0.33
Front-end Loader Operator
Area samples (mill and shop air)
Last sampled: 2015-09-29, 10 years ago
2
samples
Show the individual readings (2)
Date
Contaminant
Concentration
Limit
Conc / limit
Area sampled
2015-09-29
Respirable dust, <.1mg
0
MP WASH/SCREEN
2015-09-29
Respirable dust, <.1mg
0
SF ACTIVE MINING
Source: MSHA respirable dust, quartz, and noise sampling records, updated weekly. Metal/nonmetal contaminant figures come from MSHA's Personal Health Samples and Area Samples files (public record), updated weekly.
ELSINORE PIT recorded 0.00 reportable injury cases per 100 full-time workers in 2008.
Injury rate, 2008
ⓘThis rate is reportable injury cases per 100 full-time-equivalent workers per year, computed as 200,000 times cases divided by MSHA operator-reported employee-hours. Cases are injuries MSHA graded degree 01 through 07; accident-only events that hurt no one are excluded, and so are contractor injuries, whose hours do not attach to a single mine. Rates begin in 2000, when quarterly employment reporting starts, and are withheld below 20,000 hours in a year.
0.00
total case rate
0.00
days-away rate
0.000
fatality rate
No reportable injury cases in any year shown. Employee-hours were reported in each of those years, so these are true zeros rather than missing data. Citations, listed in the compliance record above, are inspector-found violations and are counted separately from worker injuries.
Below average. The US metal and nonmetal mining average was 3.15 and the all-US-mining average was 3.61 cases per 100 workers.
In Utah, metal and nonmetal mining averaged 2.54 cases per 100 workers that year.
Under 100,000 employee-hours were reported that year, so a single case moves the rate by two or more. Read the figure as approximate.
Source: injury cases from MSHA accident and injury records; employee-hours from MSHA quarterly employment reports. Rate is cases per 100 full-time-equivalent workers, operator employees only.
Source: MSHA controller and operator history, updated weekly.
Workforce and production
Year
Employees
2026
8
2025
5
2024
9
2023
6
2022
7
2021
4
2020
4
2019
5
2018
9
2017
7
2016
5
2015
6
2014
5
2013
3
2012
3
2011
2
2010
9
2009
8
2008
10
Source: MSHA quarterly employment and production, updated weekly.
ELSINORE PIT sits in Sevier County, Utah, where the Census mining category is 3.4% of county employment.
Local economic context
ⓘCounty figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.
Sevier County, Utah · Population 21,854
3.4%
Mining share of county employment
$73,765
Median household income
Source: US Census Bureau, American Community Survey 2023 5-year estimates.
Quarterly safety rates
ⓘCitations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.
Citations per million employee-hours, as reported to MSHA
Quarter
Hours worked
Citations
S&S
Per 1M hrs
2026 Q2
1,914
0
0
0.0
2025 Q4
724
0
0
0.0
2025 Q3
1,460
0
0
0.0
2025 Q2
1,267
0
0
0.0
2025 Q1
0
0
0
2024 Q4
1,479
0
0
0.0
2024 Q3
1,809
0
0
0.0
2024 Q2
2,465
0
0
0.0
Show 58 earlier quartersHide earlier quarters
Quarter
Hours worked
Citations
S&S
Per 1M hrs
2024 Q1
134
0
0
0.0
2023 Q4
372
0
0
0.0
2023 Q3
1,467
0
0
0.0
2023 Q2
1,038
0
0
0.0
2023 Q1
0
0
0
2022 Q4
446
0
0
0.0
2022 Q3
2,226
0
0
0.0
2022 Q2
1,904
0
0
0.0
2022 Q1
165
0
0
0.0
2021 Q4
536
0
0
0.0
2021 Q3
1,568
0
0
0.0
2021 Q2
1,087
0
0
0.0
2021 Q1
0
0
0
2020 Q4
996
1
0
1004.0
2020 Q3
954
0
0
0.0
2020 Q2
509
0
0
0.0
2020 Q1
0
0
0
2019 Q4
0
0
0
2019 Q3
1,344
0
0
0.0
2019 Q2
1,688
0
0
0.0
2018 Q4
1,049
0
0
0.0
2018 Q3
1,685
0
0
0.0
2018 Q2
1,503
0
0
0.0
2017 Q4
1,752
2
0
1141.6
2017 Q3
2,342
0
0
0.0
2017 Q2
1,486
0
0
0.0
2016 Q4
4
0
0
0.0
2016 Q3
1,410
0
0
0.0
2016 Q2
1,494
0
0
0.0
2016 Q1
310
0
0
0.0
2015 Q4
849
0
0
0.0
2015 Q3
1,421
0
0
0.0
2015 Q2
1,022
2
0
1956.9
2014 Q4
64
0
0
0.0
2014 Q3
1,153
0
0
0.0
2014 Q2
1,834
0
0
0.0
2014 Q1
242
0
0
0.0
2013 Q4
1,177
0
0
0.0
2013 Q3
1,114
0
0
0.0
2013 Q2
2,296
0
0
0.0
2012 Q4
655
0
0
0.0
2012 Q3
878
0
0
0.0
2012 Q2
1,215
0
0
0.0
2012 Q1
411
0
0
0.0
2011 Q4
931
1
0
1074.1
2011 Q3
1,030
2
0
1941.7
2010 Q4
1,914
0
0
0.0
2010 Q3
4,989
0
0
0.0
2010 Q2
6,803
6
1
882.0
2010 Q1
3,294
0
0
0.0
2009 Q4
1,969
0
0
0.0
2009 Q3
3,700
0
0
0.0
2009 Q2
7,164
0
0
0.0
2009 Q1
2,139
0
0
0.0
2008 Q4
4,819
0
0
0.0
2008 Q3
8,618
4
1
464.1
2008 Q2
6,708
0
0
0.0
2008 Q1
3,452
1
0
289.7
No fatalities recorded at this mine.
Reportable incidents
1 on file
2010 · 1 incident
June 23, 2010UT · Metal/Non-Metalbulldozer operator, universal operator, heavy equipment operator, operating engineerHANDLING OF MATERIALS
While changing screens employee bumped elbow on equipment. Employee did not have any medical symptoms following incident. Employee later had symptoms evolve and sought medical care without notifying employer. Injury did not require medical treatment, until later visit when employee had fluids drained and received Steroid Rx treatment.