Employee was assisting with setting a water pump. After unhooking the chain the employee stepped down from the pump on uneven ground causing an ankle twist. X-Ray showed a fracture.
Linden Plant Metal/Non-Metal
American Materials Company, LLC
· Surface
Controlled by
Quikrete Holdings Inc.
Linden,
Cumberland County,
NC
·
Active
MSHA Mine ID: 3102289
Linden Plant has $2K in proposed MSHA penalties and $0 outstanding across 0 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Linden Plant.
- Fatalities
- 0
- Total incidents
- 1
- Years on record
- 2019
- Latest incident
- Jul 2019
Compliance record
MSHA citations since 2014
11
citations
3
significant & substantial
$2,100
proposed penalties
$2,100
paid to date
100% of proposed penalties paid to date, a $0 gap.
Source: MSHA violations data, updated weekly.
Inspection activity
MSHA inspections since 2014
36
inspections on record
289
inspection hours
n/a
citations per 100 inspection hours
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.Rate withheld: 289 inspection hours is too few for a stable rate. A minimum of 1,000 inspection hours is required.
Source: MSHA inspections data, updated weekly.
Linden Plant has $2K in proposed MSHA penalties and $0 outstanding across 0 contested dockets.
Penalty disposition
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.$2K
proposed penalties
$2K
current assessed
$2K
paid to date
$0
outstanding
11 assessments are final orders; 0 contested dockets.
As of the most recent assessment on 2022-11-16.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
See also
the operator's enforcement record
Quarterly safety rates
ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.Citations per million employee-hours, as reported to MSHA
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2025 Q4 | 5,422 | 0 | 0 | 0.0 |
| 2025 Q3 | 5,057 | 0 | 0 | 0.0 |
| 2025 Q2 | 5,123 | 0 | 0 | 0.0 |
| 2025 Q1 | 4,815 | 0 | 0 | 0.0 |
| 2024 Q4 | 4,918 | 0 | 0 | 0.0 |
| 2024 Q3 | 5,363 | 0 | 0 | 0.0 |
| 2024 Q2 | 5,957 | 0 | 0 | 0.0 |
| 2024 Q1 | 5,110 | 0 | 0 | 0.0 |
Show 40 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2023 Q4 | 4,426 | 0 | 0 | 0.0 |
| 2023 Q3 | 5,541 | 0 | 0 | 0.0 |
| 2023 Q2 | 5,240 | 0 | 0 | 0.0 |
| 2023 Q1 | 4,876 | 0 | 0 | 0.0 |
| 2022 Q4 | 5,780 | 1 | 0 | 173.0 |
| 2022 Q3 | 4,654 | 0 | 0 | 0.0 |
| 2022 Q2 | 4,316 | 0 | 0 | 0.0 |
| 2022 Q1 | 3,841 | 0 | 0 | 0.0 |
| 2021 Q4 | 4,104 | 1 | 0 | 243.7 |
| 2021 Q3 | 4,319 | 0 | 0 | 0.0 |
| 2021 Q2 | 4,701 | 0 | 0 | 0.0 |
| 2021 Q1 | 4,555 | 0 | 0 | 0.0 |
| 2020 Q4 | 3,961 | 0 | 0 | 0.0 |
| 2020 Q3 | 4,031 | 0 | 0 | 0.0 |
| 2020 Q2 | 4,189 | 0 | 0 | 0.0 |
| 2020 Q1 | 4,217 | 0 | 0 | 0.0 |
| 2019 Q4 | 4,967 | 1 | 0 | 201.3 |
| 2019 Q3 | 2,696 | 0 | 0 | 0.0 |
| 2019 Q2 | 3,411 | 0 | 0 | 0.0 |
| 2019 Q1 | 3,481 | 0 | 0 | 0.0 |
| 2018 Q4 | 2,941 | 0 | 0 | 0.0 |
| 2018 Q3 | 3,691 | 3 | 1 | 812.8 |
| 2018 Q2 | 2,968 | 0 | 0 | 0.0 |
| 2018 Q1 | 3,114 | 0 | 0 | 0.0 |
| 2017 Q4 | 3,020 | 0 | 0 | 0.0 |
| 2017 Q3 | 3,295 | 0 | 0 | 0.0 |
| 2017 Q2 | 3,085 | 1 | 0 | 324.1 |
| 2017 Q1 | 2,411 | 0 | 0 | 0.0 |
| 2016 Q4 | 2,198 | 2 | 1 | 909.9 |
| 2016 Q3 | 2,187 | 0 | 0 | 0.0 |
| 2016 Q2 | 1,738 | 0 | 0 | 0.0 |
| 2016 Q1 | 2,416 | 0 | 0 | 0.0 |
| 2015 Q4 | 2,541 | 0 | 0 | 0.0 |
| 2015 Q3 | 2,529 | 0 | 0 | 0.0 |
| 2015 Q2 | 2,188 | 0 | 0 | 0.0 |
| 2015 Q1 | 1,586 | 0 | 0 | 0.0 |
| 2014 Q4 | 2,017 | 1 | 0 | 495.8 |
| 2014 Q3 | 2,256 | 0 | 0 | 0.0 |
| 2014 Q2 | 2,038 | 0 | 0 | 0.0 |
| 2014 Q1 | 640 | 1 | 1 | 1562.5 |
No fatalities recorded at this mine.
Reportable incidents
1 on file2019 · 1 incident
July 29, 2019
NC · Metal/Non-Metal
bulldozer operator, universal operator, heavy equipment operator, operating engineer
SLIP OR FALL OF PERSON
American Materials Company, LLC · Over-exertion (Not Elsewhere Classified)
For insurers, brokers, and safety consultants
The full compliance file on Linden Plant
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF with the underlying data as CSV.