Employee was helping change a battery on a man trip when battery lead arced and a spark struck employee in face & eye.
Miura No. 2: 260 MSHA citations Coal
Miura No. 2 has $148K in proposed MSHA penalties and $7K outstanding across 6 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Miura No. 2.
- Fatalities
- 0
- Total incidents
- 17
- Years on record
- 2004–2009
- Latest incident
- Jan 2009
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.Miura No. 2 has $148K in proposed MSHA penalties and $7K outstanding across 6 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.ⓘ
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.- Settled 22 · 88%
- Stood as issued 2 · 8%
- Vacated or withdrawn 1 · 4%
ⓘ
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.ⓘ
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.| Docket | Decision | Judge | Year | Proposed / upheld |
|---|---|---|---|---|
| WEVA 2009-1334 | Settlement | Feldman | 2011 | $34K → $25K |
| WEVA 2007-277 | Settlement | Zielinski | 2007 | $20K → $11K |
| WEVA 2007-223 | Settlement | Zielinski | 2007 | $17K → $12K |
| WEVA 2009-1335 | Settlement | Gill | 2010 | $9K → $4K |
| WEVA 2007-760 | Default | Lesnick | 2010 | $8K → $8K |
| WEVA 2009-926 | Vacate | Lesnick | 2011 | $540 → $0 |
MSHA sampling at Miura No. 2 shows 94% of 158 respirable coal dust samples met the 1.5 mg/m3 standard.
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.Respirable coal dust
ⓘ
Respirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.
Last sampled: 2009-04-22, 17 years ago
ⓘ
Respirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.- CONTINUOUS MINER OPERATOR91
- SHUTTLE CAR OPERATOR (STANDARD SIDE)18
- ROOF BOLTER (SINGLE HEAD)7
Silica (quartz)
Last sampled: 2009-05-01, 17 years ago- CONTINUOUS MINER OPERATOR8
Noise
ⓘ
The share counts noise samples whose measured dose exceeded the 90 dBA permissible exposure limit. It describes the sampled workplace, not what reached the miner's ear: hearing conservation programs and the hearing protection worn during the shift are recorded separately and are not reflected here.
Last sampled: 2009-04-13, 17 years ago
ⓘ
The share counts noise samples whose measured dose exceeded the 90 dBA permissible exposure limit. It describes the sampled workplace, not what reached the miner's ear: hearing conservation programs and the hearing protection worn during the shift are recorded separately and are not reflected here.- SHUTTLE CAR OPERATOR (STANDARD SIDE)3
- CONTINUOUS MINER OPERATOR2
- ELECTRICIAN1
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.ⓘ
Respirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.| Year | within 1.5 mg/m3 | samples |
|---|---|---|
| 2009 | 71% | 17 |
| 2008 | 100% | 28 |
| 2006 | 97% | 36 |
| 2005 | 97% | 58 |
| 2004 | 89% | 19 |
| Year | silica avg (%) | samples |
|---|---|---|
| 2009 | 9.7 | 1 |
| 2008 | 6.3 | 2 |
| 2006 | 8.6 | 2 |
| 2005 | 9.3 | 4 |
| 2004 | 5.3 | 2 |
| Year | over PEL | samples |
|---|---|---|
| 2009 | 0% | 5 |
| 2008 | 0% | 5 |
Miura No. 2 recorded 0.00 reportable injury cases per 100 full-time workers in 2008.
ⓘ
This rate is reportable injury cases per 100 full-time-equivalent workers per year, computed as 200,000 times cases divided by MSHA operator-reported employee-hours. Cases are injuries MSHA graded degree 01 through 07; accident-only events that hurt no one are excluded, and so are contractor injuries, whose hours do not attach to a single mine. Rates begin in 2000, when quarterly employment reporting starts, and are withheld below 20,000 hours in a year.| Year | total case rate | days-away | fatal |
|---|---|---|---|
| 2008 * | 0.00 | 0.00 | 0.000 |
| 2006 * | 7.98 | 5.32 | 0.000 |
| 2005 * | 0.00 | 0.00 | 0.000 |
- West-Burg Mining, Inc. 2004 to 2004
- Rama Development Co., Inc. 2004 to 2005
- Hanover Resources, LLC 2005 to present
ⓘ
Coal production is reported quarterly and lags the current period; the most recent quarters may be incomplete.| Year | Employees | Coal produced (tons) |
|---|---|---|
| 2009 | 11 | 46,253 |
| 2008 | 19 | 51,259 |
| 2007 | 2 | |
| 2006 | 35 | 168,482 |
| 2005 | 23 | 92,360 |
| 2004 | 22 | 53,767 |
Miura No. 2 sits in Kanawha County, West Virginia, where the Census mining category is 1.9% of county employment.
ⓘ
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2009 Q4 | 0 | 0 | 0 | |
| 2009 Q3 | 0 | 1 | 0 | |
| 2009 Q2 | 5,267 | 14 | 6 | 2658.1 |
| 2009 Q1 | 14,655 | 49 | 25 | 3343.6 |
| 2008 Q4 | 19,065 | 34 | 7 | 1783.4 |
| 2008 Q3 | 14,949 | 18 | 0 | 1204.1 |
| 2008 Q2 | 6,730 | 4 | 0 | 594.4 |
| 2008 Q1 | 378 | 1 | 0 | 2645.5 |
Show 14 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2007 Q4 | 1,001 | 0 | 0 | 0.0 |
| 2007 Q3 | 1,581 | 0 | 0 | 0.0 |
| 2007 Q2 | 912 | 0 | 0 | 0.0 |
| 2007 Q1 | 630 | 0 | 0 | 0.0 |
| 2006 Q4 | 16,572 | 3 | 1 | 181.0 |
| 2006 Q3 | 21,273 | 21 | 16 | 987.2 |
| 2006 Q2 | 18,818 | 33 | 24 | 1753.6 |
| 2006 Q1 | 18,511 | 16 | 11 | 864.4 |
| 2005 Q4 | 9,166 | 23 | 19 | 2509.3 |
| 2005 Q3 | 13,542 | 10 | 8 | 738.4 |
| 2005 Q2 | 14,362 | 6 | 5 | 417.8 |
| 2005 Q1 | 14,779 | 10 | 9 | 676.6 |
| 2004 Q4 | 10,051 | 3 | 1 | 298.5 |
| 2004 Q3 | 6,135 | 14 | 8 | 2282.0 |
Reportable incidents
17 on file2009 · 1 incident
2008 · 2 incidents
While making a pre-shift a fall was found on the #1 belt 30" inby spad 42 measuring 20" wide x 40long x 8"high, after further investgation it was found to a large lip 6' resin bolts was used in complete area.
A fall measuring 20' wide x 4' thick and 30' long was discovered on 2/19/08 at 12:25 pm with a federal mine inspector at spad #382 in the #3 entry. The fall will not be cleaned up build cribs ground fall area and dangered off. The fall is about 2000; from seciton.
2006 · 4 incidents
A rock fell between bolts, measuring 45" long X 23" wide X 1-3" thick, striking victim on head. Location of accident, 1 break inby spad 859 #4 entry 44' from face.
EMPLOYEE WAS REPLACING PUMP MOTOR IN MINER, MOTOR SLIPPED AND FELL ON EMPLOYEES HAND.
At 2:37 pm a roof fall was discovered by the preshift examiner. The fall ranges from 36 to 48" thick, 18' long, 19' wide. The fall will be cleaned up and supported. The location of the fall is at spad 222 in the #4 entry.
EMPLOYEE WAS JARRED WHILE RIDING IN MANTRIP. EMPLOYEE DID NOT BEGIN MISSING WORK UNTIL 5/8/06.
2005 · 9 incidents
A FALL OCCURRED IN THE #5 ENTRY AT SPAD 215 MEASURING 17' LONG, 19' WIDE, 4.5 HIGH. THE FALL AREA HAS BEEN TIMBERED OFF AND DANGERED OFF. THE FALL WILL NOT BE CLEANED UP. THIS FALL OCCURRED APPROX 1800' FROM FACE.
MINE FOREMAN AND MSHA ROOF CONTROL INSPECTOR WERE TRAVELING INTAKE AIRWAY #7 ENTRY SPAD #169. DISCOVERED ROOF FALL MEASURING 20 FT WIDE X 20 FT LONG X 5 FT THICK AT 10:00 AM. FALL WILL BE TIMBERED OFF AND ESCAPEWAY REROUTED. THIS AREA WAS MINED SEPTEMBER 2004 AND BOLTED WITH 4 FT RESIN BOLTS. THIS AREA WAS LAST FIREBOSSED ON 9/22/05.
MINE FOREMAN WAS MAKING FIREBOSS RUN AT APPROXIMATELY 4:30 AM DISCOVERED ROOF FALL IN #3 ENTRY MEASURING 10 FT WIDE X 20 FT LONG X 5 FT THICK. 40 FT INBY SPAD 160. THIS AREA WAS BOLTED WITH 4 FT RESIN BOLTS. FALL WILL BE CLEANED UP AND REBOLTED WITH 6 FT BOLTS AND ANY ADDITIONAL SUPPORT.
A fall occurred in the #7 entry at spad 200 measuring 19' wide x 20' long x 5' high. The fall will be timbered off and dangered off and will not be cleaned up. This fall is 1800' from working face.
Mine Foreman was making fireboss run. At apptox 6"22 am, discovered a roof fall in #3 entry. BRK 41, 1 bk. inby spad 214. Fall measures 20'lx18'wx4'thick. Type of roof bolts used in this area was #5x48". No, person or equipment involved. The wall will be timbered and dangered off.
MINE FOREMAN WAS MAKING FIREBOSS RUN AT APPROX 5:10AM. DISCOVERED ROOF FALL IN INTAKE AIRWAY, SPAD 201 #6 ENTRY INTERSECTION AND 2 BRKS INBY AT SPAD 218 #7 ENTRY INTERSECTION. (NOTE THERE IS 2 INTAKE AIRWAYS #6 IS USED PRIMARY ESCAPEWAY, REROUTED ESCAPEWAY FROM #6 TO #7 IN THIS AIRWAY. BOTH FALLS MEASURED 20'X18'X5'
EMPLOYEE PUT THE LAST BOLT UP IN ROW & WAS GETTING READY TO MOVE THE BOLTER WHEN A PIECE OF DRAW SLATE FELL BETWEEN BOLTS STRIKING EMPLOYEE.
#2 FACE EMPLOYEE WAS BOLTING, PUT OUTSIDE BOLT UP, SWUNG BOOM IN FOR INSIDE BOLT, ROCK FELL OUT AND STRUCK EMPLOYEE ON RIGHT THIGH.
Employee was walking behind roof bolter when roof bolter operator started reeling cable up on cable reel. The cable was in a mud hole and the employee didn't see the cable being taken up. The cable wrapped around left ankle, throwing employee up into roof of mine and employee landed in mud and water.
2004 · 1 incident
Employee was helping put guard on feeder. The other end of guard slipped out of co-worker's hand, shifting all the weight of guard on injured employee. The weight from the guard jammed right hand of injured employee against metal feeder frame.