Injured was lifting the hood of a MT995 tractor to service the a/c when the shoulder felt like it tore. Injured went to the clinic on 8/8 and they treated and ordered a MRI. On 8/17 the MRI showed that there was a tear in the right rotator cuff. Injured is scheduled for surgery on 9/2.
Oaktown Fuels Preparation Plant Coal
Oaktown Fuels Preparation Plant has $22K in proposed MSHA penalties and $1K outstanding across 2 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Oaktown Fuels Preparation Plant.
- Fatalities
- 0
- Total incidents
- 10
- Years on record
- 2013–2022
- Latest incident
- Jul 2022
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.Oaktown Fuels Preparation Plant has $22K in proposed MSHA penalties and $1K outstanding across 2 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.MSHA sampling at Oaktown Fuels Preparation Plant shows respirable coal dust averaging 0.10 mg/m3 (100% compliant) across 247 samples.
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.ⓘ
Respirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2025 Q4 | 25,486 | 0 | 0 | 0.0 |
| 2025 Q3 | 24,826 | 1 | 0 | 40.3 |
| 2025 Q2 | 24,054 | 0 | 0 | 0.0 |
| 2025 Q1 | 24,404 | 0 | 0 | 0.0 |
| 2024 Q4 | 22,311 | 1 | 0 | 44.8 |
| 2024 Q3 | 22,570 | 0 | 0 | 0.0 |
| 2024 Q2 | 24,293 | 0 | 0 | 0.0 |
| 2024 Q1 | 34,160 | 1 | 0 | 29.3 |
Show 43 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2023 Q4 | 41,896 | 0 | 0 | 0.0 |
| 2023 Q3 | 46,630 | 0 | 0 | 0.0 |
| 2023 Q2 | 41,480 | 0 | 0 | 0.0 |
| 2023 Q1 | 40,966 | 4 | 2 | 97.6 |
| 2022 Q4 | 37,847 | 0 | 0 | 0.0 |
| 2022 Q3 | 37,449 | 3 | 0 | 80.1 |
| 2022 Q2 | 35,868 | 0 | 0 | 0.0 |
| 2022 Q1 | 35,085 | 0 | 0 | 0.0 |
| 2021 Q4 | 32,866 | 3 | 0 | 91.3 |
| 2021 Q3 | 32,946 | 0 | 0 | 0.0 |
| 2021 Q2 | 31,899 | 16 | 1 | 501.6 |
| 2021 Q1 | 31,373 | 0 | 0 | 0.0 |
| 2020 Q4 | 28,587 | 2 | 2 | 70.0 |
| 2020 Q3 | 28,462 | 0 | 0 | 0.0 |
| 2020 Q2 | 28,689 | 1 | 0 | 34.9 |
| 2020 Q1 | 34,288 | 2 | 1 | 58.3 |
| 2019 Q4 | 35,535 | 0 | 0 | 0.0 |
| 2019 Q3 | 36,964 | 2 | 1 | 54.1 |
| 2019 Q2 | 36,892 | 4 | 0 | 108.4 |
| 2019 Q1 | 38,264 | 11 | 1 | 287.5 |
| 2018 Q4 | 37,630 | 1 | 0 | 26.6 |
| 2018 Q3 | 20,971 | 2 | 1 | 95.4 |
| 2018 Q2 | 23,755 | 0 | 0 | 0.0 |
| 2018 Q1 | 35,472 | 0 | 0 | 0.0 |
| 2017 Q4 | 21,137 | 6 | 2 | 283.9 |
| 2017 Q3 | 16,720 | 4 | 1 | 239.2 |
| 2017 Q2 | 19,213 | 4 | 1 | 208.2 |
| 2017 Q1 | 20,326 | 9 | 8 | 442.8 |
| 2016 Q4 | 21,979 | 8 | 5 | 364.0 |
| 2016 Q3 | 31,088 | 7 | 4 | 225.2 |
| 2016 Q2 | 19,597 | 2 | 0 | 102.1 |
| 2016 Q1 | 32,698 | 1 | 0 | 30.6 |
| 2015 Q4 | 34,523 | 2 | 0 | 57.9 |
| 2015 Q3 | 34,549 | 3 | 0 | 86.8 |
| 2015 Q2 | 34,449 | 0 | 0 | 0.0 |
| 2015 Q1 | 35,410 | 6 | 2 | 169.4 |
| 2014 Q4 | 35,154 | 0 | 0 | 0.0 |
| 2014 Q3 | 40,852 | 8 | 4 | 195.8 |
| 2014 Q2 | 42,304 | 2 | 1 | 47.3 |
| 2014 Q1 | 41,763 | 1 | 0 | 23.9 |
| 2013 Q4 | 40,048 | 2 | 0 | 49.9 |
| 2013 Q3 | 51,366 | 13 | 0 | 253.1 |
| 2013 Q2 | 27,187 | 1 | 0 | 36.8 |
Reportable incidents
10 on file2022 · 2 incidents
Injured walked out the door of the prep plant going to the foreman's pickup. Due to the weather conditions the whole area was a solid sheet of ice. The injured slipped and fell hurting the right shoulder as the injured tried to catch self. The injured was still in discomfort on 4/1/2022 and went to the doctor. On 4/6/2022 and MRI showed a tear in the rotator cuff.
2019 · 2 incidents
Injured was replacing the back plate of a refuse screen and received a laceration on right hand during the process. Injured received stitches for the laceration.
Injured was pulling new belt and finger was smashed by roller bar. This caused a fracture to the index finger.
2018 · 1 incident
Injured was moving the fork of the telehandler and pinched EE's finger between the fork and the headache bar of the machine. Injured suffered a laceration as a result of this and received stitches for this injury.
2017 · 1 incident
Smoke was observed coming from the raw coal pile at approx. 6pm on 6/7/17. A track-hoe was dispatched to the spot observed & began digging our the spot where the smoke was observed. At approx. 8:45am MSHA inspector arrived on site and questioned if we had reported the incident. Part 50 is a fire not extinguished within 30 min not smoke! We were issued a citation.
2016 · 2 incidents
The injured was in the process of removing a gear box from a bin roller when the gear box cleared the shaft it made an upward motion pinching index finger between the motor pedal and the motor causing a laceration. The injured was seen by a doctor and received stitches.
The injured was lowering a 40 foot extension ladder down to the floor with another employee to move the ladder to the needed location when the second employee lost their grip on the foot end of the ladder. This resulted in the weight on the ladder coming down on the left shoulder of the injured.
2015 · 1 incident
Injured was exiting cab of crane. Injured lost his footing and all of his weight shifted to his right arm while holding onto the grab handle. Right shoulder became dislocated. This is a aggravation of a previous injury. Should was put back into place at Good Samaritan Hospital Emergency room.
2013 · 1 incident
A dozer caught on fire while pushing coal. The fire was not extinguished within 30 minutes and was reported immediately to MSHA.
The full compliance file on Oaktown Fuels Preparation Plant
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF with the underlying data as CSV.