Injured was lifting the hood of a MT995 tractor to service the a/c when the shoulder felt like it tore. Injured went to the clinic on 8/8 and they treated and ordered a MRI. On 8/17 the MRI showed that there was a tear in the right rotator cuff. Injured is scheduled for surgery on 9/2.
Oaktown Fuels Preparation Plant: 147 MSHA citations Coal
Oaktown Fuels Preparation Plant has $27K in proposed MSHA penalties and $5K outstanding across 4 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Oaktown Fuels Preparation Plant.
- Fatalities
- 0
- Total incidents
- 10
- Years on record
- 2013–2022
- Latest incident
- Jul 2022
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.ⓘ
A Section 107(a) order removes miners from an area when an inspector finds an imminent danger. Each order is lifted once the condition is corrected, so this counts orders issued, not orders now in effect.Oaktown Fuels Preparation Plant has $27K in proposed MSHA penalties and $5K outstanding across 4 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.ⓘ
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.- Settled 4 · 50%
- Still open 4 · 50%
ⓘ
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.ⓘ
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.| Docket | Decision | Judge | Year | Proposed / upheld |
|---|---|---|---|---|
| LAKE 2015-0230 | Settlement | Lesnick | 2015 | $2K → $2K |
| LAKE 2017-0120 | Settlement | Gill | 2017 | $1K → $1K |
| LAKE 2026-0183 | Decision pending | |||
| LAKE 2026-0194 | Decision pending |
MSHA sampling at Oaktown Fuels Preparation Plant shows 100% of 253 respirable coal dust samples met the 1.5 mg/m3 standard.
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.Respirable coal dust
ⓘ
Respirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.
Last sampled: 2026-08-17
ⓘ
Respirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.ⓘ
The excessive concentration value (ECV) is MSHA's own per-sample enforcement threshold, which builds in measurement uncertainty; a sample over its ECV can trigger a citation. The count covers only samples MSHA assigned an ECV.- BULLDOZER OPERATOR168
- CLEANING PLANT OPERATOR19
- REFUSE TRUCK DRIVER/BACKFILL TRUCK DRIVE19
Silica (quartz)
Last sampled: 2023-03-02, 3 years ago- BULLDOZER OPERATOR6
Noise
ⓘ
The share counts noise samples whose measured dose exceeded the 90 dBA permissible exposure limit. It describes the sampled workplace, not what reached the miner's ear: hearing conservation programs and the hearing protection worn during the shift are recorded separately and are not reflected here.
Last sampled: 2026-02-11
ⓘ
The share counts noise samples whose measured dose exceeded the 90 dBA permissible exposure limit. It describes the sampled workplace, not what reached the miner's ear: hearing conservation programs and the hearing protection worn during the shift are recorded separately and are not reflected here.- BULLDOZER OPERATOR31
- CLEANING PLANT OPERATOR14
- HIGHLIFT OPERATOR/FRONT END LOADER8
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.ⓘ
Respirable coal dust and silica figures cover coal facilities. Dust compliance is measured against the current 1.5 mg/m3 standard; samples predating the 2014 standard are included, so compliance rates are a coarse historical signal.| Year | within 1.5 mg/m3 | samples |
|---|---|---|
| 2026 | 100% | 20 |
| 2025 | 100% | 13 |
| 2024 | 100% | 24 |
| 2023 | 94% | 18 |
| 2022 | 100% | 13 |
| 2021 | 100% | 23 |
| 2020 | 100% | 13 |
| 2019 | 100% | 23 |
| 2018 | 100% | 16 |
| 2017 | 100% | 25 |
| 2016 | 100% | 25 |
| 2015 | 100% | 20 |
| 2014 | 100% | 7 |
| 2013 | 100% | 13 |
| Year | silica avg (%) | samples |
|---|---|---|
| 2023 | 3.9 | 2 |
| 2022 | 0.3 | 1 |
| 2021 | 2.4 | 1 |
| 2016 | 3.8 | 2 |
| Year | over PEL | samples |
|---|---|---|
| 2026 | 0% | 4 |
| 2024 | 0% | 5 |
| 2023 | 20% | 5 |
| 2021 | 10% | 10 |
| 2020 | 0% | 4 |
| 2019 | 10% | 10 |
| 2017 | 0% | 5 |
| 2016 | 10% | 10 |
| 2015 | 0% | 5 |
| 2013 | 46% | 13 |
Oaktown Fuels Preparation Plant recorded 0.00 reportable injury cases per 100 full-time workers in 2025.
ⓘ
This rate is reportable injury cases per 100 full-time-equivalent workers per year, computed as 200,000 times cases divided by MSHA operator-reported employee-hours. Cases are injuries MSHA graded degree 01 through 07; accident-only events that hurt no one are excluded, and so are contractor injuries, whose hours do not attach to a single mine. Rates begin in 2000, when quarterly employment reporting starts, and are withheld below 20,000 hours in a year.| Year | total case rate | days-away | fatal |
|---|---|---|---|
| 2025 * | 0.00 | 0.00 | 0.000 |
| 2024 | 0.00 | 0.00 | 0.000 |
| 2023 | 0.00 | 0.00 | 0.000 |
| 2022 | 2.74 | 0.00 | 0.000 |
| 2021 | 0.00 | 0.00 | 0.000 |
| 2020 | 0.00 | 0.00 | 0.000 |
| 2019 | 1.35 | 0.00 | 0.000 |
| 2018 | 1.70 | 0.00 | 0.000 |
- Black Panther Mining LLC 2013 to 2014
- Sunrise Coal, LLC 2014 to present
| Year | Employees |
|---|---|
| 2026 | 56 |
| 2025 | 52 |
| 2024 | 57 |
| 2023 | 87 |
| 2022 | 73 |
| 2021 | 68 |
| 2020 | 61 |
| 2019 | 72 |
| 2018 | 59 |
| 2017 | 57 |
| 2016 | 59 |
| 2015 | 60 |
| 2014 | 65 |
| 2013 | 58 |
Oaktown Fuels Preparation Plant sits in Knox County, Indiana, where the Census mining category is 2.0% of county employment.
ⓘ
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2026 Q2 | 26,358 | 11 | 3 | 417.3 |
| 2026 Q1 | 26,586 | 0 | 0 | 0.0 |
| 2025 Q4 | 25,486 | 0 | 0 | 0.0 |
| 2025 Q3 | 24,826 | 1 | 0 | 40.3 |
| 2025 Q2 | 24,054 | 0 | 0 | 0.0 |
| 2025 Q1 | 24,404 | 0 | 0 | 0.0 |
| 2024 Q4 | 22,311 | 1 | 0 | 44.8 |
| 2024 Q3 | 22,570 | 0 | 0 | 0.0 |
Show 45 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2024 Q2 | 24,293 | 0 | 0 | 0.0 |
| 2024 Q1 | 34,160 | 1 | 0 | 29.3 |
| 2023 Q4 | 41,896 | 0 | 0 | 0.0 |
| 2023 Q3 | 46,630 | 0 | 0 | 0.0 |
| 2023 Q2 | 41,480 | 0 | 0 | 0.0 |
| 2023 Q1 | 40,966 | 4 | 2 | 97.6 |
| 2022 Q4 | 37,847 | 0 | 0 | 0.0 |
| 2022 Q3 | 37,449 | 3 | 0 | 80.1 |
| 2022 Q2 | 35,868 | 0 | 0 | 0.0 |
| 2022 Q1 | 35,085 | 0 | 0 | 0.0 |
| 2021 Q4 | 32,866 | 3 | 0 | 91.3 |
| 2021 Q3 | 32,946 | 0 | 0 | 0.0 |
| 2021 Q2 | 31,899 | 16 | 1 | 501.6 |
| 2021 Q1 | 31,373 | 0 | 0 | 0.0 |
| 2020 Q4 | 28,587 | 0 | 0 | 0.0 |
| 2020 Q3 | 28,462 | 0 | 0 | 0.0 |
| 2020 Q2 | 28,689 | 1 | 0 | 34.9 |
| 2020 Q1 | 34,288 | 2 | 1 | 58.3 |
| 2019 Q4 | 35,535 | 0 | 0 | 0.0 |
| 2019 Q3 | 36,964 | 1 | 0 | 27.1 |
| 2019 Q2 | 36,892 | 4 | 0 | 108.4 |
| 2019 Q1 | 38,264 | 11 | 1 | 287.5 |
| 2018 Q4 | 37,630 | 0 | 0 | 0.0 |
| 2018 Q3 | 20,971 | 2 | 1 | 95.4 |
| 2018 Q2 | 23,755 | 0 | 0 | 0.0 |
| 2018 Q1 | 35,472 | 0 | 0 | 0.0 |
| 2017 Q4 | 21,137 | 6 | 2 | 283.9 |
| 2017 Q3 | 16,720 | 4 | 1 | 239.2 |
| 2017 Q2 | 19,213 | 4 | 1 | 208.2 |
| 2017 Q1 | 20,326 | 0 | 0 | 0.0 |
| 2016 Q4 | 21,979 | 4 | 1 | 182.0 |
| 2016 Q3 | 31,088 | 4 | 3 | 128.7 |
| 2016 Q2 | 19,597 | 1 | 0 | 51.0 |
| 2016 Q1 | 32,698 | 1 | 0 | 30.6 |
| 2015 Q4 | 34,523 | 2 | 0 | 57.9 |
| 2015 Q3 | 34,549 | 3 | 0 | 86.8 |
| 2015 Q2 | 34,449 | 0 | 0 | 0.0 |
| 2015 Q1 | 35,410 | 6 | 2 | 169.4 |
| 2014 Q4 | 35,154 | 0 | 0 | 0.0 |
| 2014 Q3 | 40,852 | 6 | 2 | 146.9 |
| 2014 Q2 | 42,304 | 2 | 1 | 47.3 |
| 2014 Q1 | 41,763 | 1 | 0 | 23.9 |
| 2013 Q4 | 40,048 | 2 | 0 | 49.9 |
| 2013 Q3 | 51,366 | 13 | 0 | 253.1 |
| 2013 Q2 | 27,187 | 1 | 0 | 36.8 |
Reportable incidents
10 on file2022 · 2 incidents
Injured walked out the door of the prep plant going to the foreman's pickup. Due to the weather conditions the whole area was a solid sheet of ice. The injured slipped and fell hurting the right shoulder as the injured tried to catch self. The injured was still in discomfort on 4/1/2022 and went to the doctor. On 4/6/2022 and MRI showed a tear in the rotator cuff.
2019 · 2 incidents
Injured was replacing the back plate of a refuse screen and received a laceration on right hand during the process. Injured received stitches for the laceration.
Injured was pulling new belt and finger was smashed by roller bar. This caused a fracture to the index finger.
2018 · 1 incident
Injured was moving the fork of the telehandler and pinched EE's finger between the fork and the headache bar of the machine. Injured suffered a laceration as a result of this and received stitches for this injury.
2017 · 1 incident
Smoke was observed coming from the raw coal pile at approx. 6pm on 6/7/17. A track-hoe was dispatched to the spot observed & began digging our the spot where the smoke was observed. At approx. 8:45am MSHA inspector arrived on site and questioned if we had reported the incident. Part 50 is a fire not extinguished within 30 min not smoke! We were issued a citation.
2016 · 2 incidents
The injured was in the process of removing a gear box from a bin roller when the gear box cleared the shaft it made an upward motion pinching index finger between the motor pedal and the motor causing a laceration. The injured was seen by a doctor and received stitches.
The injured was lowering a 40 foot extension ladder down to the floor with another employee to move the ladder to the needed location when the second employee lost their grip on the foot end of the ladder. This resulted in the weight on the ladder coming down on the left shoulder of the injured.
2015 · 1 incident
Injured was exiting cab of crane. Injured lost his footing and all of his weight shifted to his right arm while holding onto the grab handle. Right shoulder became dislocated. This is a aggravation of a previous injury. Should was put back into place at Good Samaritan Hospital Emergency room.
2013 · 1 incident
A dozer caught on fire while pushing coal. The fire was not extinguished within 30 minutes and was reported immediately to MSHA.