99% of proposed penalties paid to date, a $97 gap.
Source: MSHA violations data, updated weekly.
Inspection activity
MSHA inspections since 2000
80
inspections on record
1,183
inspection hours
14.2
citations per 100 inspection hours
ⓘThis rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.
168 citations across 1,183 inspection hours.
Source: MSHA inspections data, updated weekly.
Penalty disposition
ⓘDifferences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.
$18K
proposed penalties
$17K
current assessed
$17K
paid to date
$0
outstanding
157 assessments are final orders; 4 contested dockets.
As of the most recent assessment on 2008-03-26.
Source: MSHA assessed-violations and conference/litigation data, updated weekly.
September 20, 2007AK · Metal/Non-Metallaborer, blacksmith, bull gang, parts runner, roustabout, pick-up man, pitmanFatality · POWERED HAULAGE
Wilder Construction Company · Caught in, under or between running or meshing objects
A fatal accident occurred when a miner became entangled in a take up pulley on the #13 conveyor belt. A guard was in place at the time of the accident.
Watch this operator
Email me when a new MSHA incident is filed at any Wilder Construction Company mine.
For insurers, brokers, and safety consultants
The full compliance file on Wilder Construction Company
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and
docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF
with the underlying data as CSV.