EE was was working on the plant. EE was applying pressure to a prybar when EE's hands slipped off and EE's right little finger was pinched by the bar, resulting in a fracture to the tip of EE's right pinky finger.
Dracut MA Plant Metal/Non-Metal
Dracut MA Plant has $14K in proposed MSHA penalties and $0 outstanding across 5 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Dracut MA Plant.
- Fatalities
- 0
- Total incidents
- 17
- Years on record
- 1989–2026
- Latest incident
- May 2026
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.Dracut MA Plant has $14K in proposed MSHA penalties and $0 outstanding across 5 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2025 Q4 | 6,075 | 0 | 0 | 0.0 |
| 2025 Q3 | 7,808 | 0 | 0 | 0.0 |
| 2025 Q2 | 7,596 | 2 | 0 | 263.3 |
| 2025 Q1 | 3,158 | 0 | 0 | 0.0 |
| 2024 Q4 | 5,831 | 0 | 0 | 0.0 |
| 2024 Q3 | 7,378 | 1 | 0 | 135.5 |
| 2024 Q2 | 6,728 | 0 | 0 | 0.0 |
| 2024 Q1 | 3,220 | 0 | 0 | 0.0 |
Show 96 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2023 Q4 | 6,240 | 0 | 0 | 0.0 |
| 2023 Q3 | 7,221 | 1 | 0 | 138.5 |
| 2023 Q2 | 8,460 | 0 | 0 | 0.0 |
| 2023 Q1 | 4,074 | 1 | 0 | 245.5 |
| 2022 Q4 | 7,188 | 0 | 0 | 0.0 |
| 2022 Q3 | 7,420 | 1 | 1 | 134.8 |
| 2022 Q2 | 8,579 | 0 | 0 | 0.0 |
| 2022 Q1 | 4,220 | 1 | 0 | 237.0 |
| 2021 Q4 | 6,615 | 0 | 0 | 0.0 |
| 2021 Q3 | 10,462 | 7 | 0 | 669.1 |
| 2021 Q2 | 10,459 | 0 | 0 | 0.0 |
| 2021 Q1 | 4,263 | 0 | 0 | 0.0 |
| 2020 Q4 | 7,269 | 0 | 0 | 0.0 |
| 2020 Q3 | 12,847 | 0 | 0 | 0.0 |
| 2020 Q2 | 20,748 | 0 | 0 | 0.0 |
| 2020 Q1 | 11,351 | 0 | 0 | 0.0 |
| 2019 Q4 | 13,008 | 0 | 0 | 0.0 |
| 2019 Q3 | 13,798 | 1 | 0 | 72.5 |
| 2019 Q2 | 10,318 | 0 | 0 | 0.0 |
| 2019 Q1 | 4,267 | 3 | 0 | 703.1 |
| 2018 Q4 | 7,896 | 0 | 0 | 0.0 |
| 2018 Q3 | 9,430 | 0 | 0 | 0.0 |
| 2018 Q2 | 10,453 | 4 | 0 | 382.7 |
| 2018 Q1 | 6,546 | 0 | 0 | 0.0 |
| 2017 Q4 | 9,784 | 2 | 0 | 204.4 |
| 2017 Q3 | 11,378 | 0 | 0 | 0.0 |
| 2017 Q2 | 9,414 | 0 | 0 | 0.0 |
| 2017 Q1 | 5,875 | 6 | 3 | 1021.3 |
| 2016 Q4 | 8,917 | 0 | 0 | 0.0 |
| 2016 Q3 | 11,364 | 0 | 0 | 0.0 |
| 2016 Q2 | 11,015 | 1 | 0 | 90.8 |
| 2016 Q1 | 6,897 | 2 | 1 | 290.0 |
| 2015 Q4 | 11,686 | 0 | 0 | 0.0 |
| 2015 Q3 | 13,751 | 2 | 1 | 145.4 |
| 2015 Q2 | 12,287 | 0 | 0 | 0.0 |
| 2015 Q1 | 4,993 | 2 | 1 | 400.6 |
| 2014 Q4 | 8,908 | 0 | 0 | 0.0 |
| 2014 Q3 | 11,090 | 2 | 0 | 180.3 |
| 2014 Q2 | 9,161 | 0 | 0 | 0.0 |
| 2014 Q1 | 5,511 | 1 | 0 | 181.5 |
| 2013 Q4 | 9,489 | 0 | 0 | 0.0 |
| 2013 Q3 | 10,343 | 0 | 0 | 0.0 |
| 2013 Q2 | 7,245 | 4 | 1 | 552.1 |
| 2013 Q1 | 4,585 | 0 | 0 | 0.0 |
| 2012 Q4 | 8,075 | 3 | 0 | 371.5 |
| 2012 Q3 | 9,153 | 0 | 0 | 0.0 |
| 2012 Q2 | 9,532 | 0 | 0 | 0.0 |
| 2012 Q1 | 6,791 | 3 | 2 | 441.8 |
| 2011 Q4 | 8,195 | 0 | 0 | 0.0 |
| 2011 Q3 | 10,228 | 0 | 0 | 0.0 |
| 2011 Q2 | 10,011 | 0 | 0 | 0.0 |
| 2011 Q1 | 4,868 | 3 | 0 | 616.3 |
| 2010 Q4 | 8,089 | 0 | 0 | 0.0 |
| 2010 Q3 | 9,576 | 1 | 0 | 104.4 |
| 2010 Q2 | 8,181 | 0 | 0 | 0.0 |
| 2010 Q1 | 4,009 | 0 | 0 | 0.0 |
| 2009 Q4 | 6,338 | 0 | 0 | 0.0 |
| 2009 Q3 | 8,349 | 0 | 0 | 0.0 |
| 2009 Q2 | 8,240 | 2 | 0 | 242.7 |
| 2009 Q1 | 3,730 | 0 | 0 | 0.0 |
| 2008 Q4 | 7,031 | 0 | 0 | 0.0 |
| 2008 Q3 | 8,365 | 8 | 0 | 956.4 |
| 2008 Q2 | 8,714 | 0 | 0 | 0.0 |
| 2008 Q1 | 3,290 | 0 | 0 | 0.0 |
| 2007 Q4 | 6,723 | 0 | 0 | 0.0 |
| 2007 Q3 | 8,095 | 8 | 0 | 988.3 |
| 2007 Q2 | 7,115 | 0 | 0 | 0.0 |
| 2007 Q1 | 3,015 | 0 | 0 | 0.0 |
| 2006 Q4 | 6,466 | 0 | 0 | 0.0 |
| 2006 Q3 | 8,358 | 0 | 0 | 0.0 |
| 2006 Q2 | 8,374 | 0 | 0 | 0.0 |
| 2006 Q1 | 4,905 | 0 | 0 | 0.0 |
| 2005 Q4 | 8,427 | 5 | 0 | 593.3 |
| 2005 Q3 | 11,313 | 6 | 1 | 530.4 |
| 2005 Q2 | 9,895 | 0 | 0 | 0.0 |
| 2005 Q1 | 7,116 | 0 | 0 | 0.0 |
| 2004 Q4 | 9,249 | 0 | 0 | 0.0 |
| 2004 Q3 | 16,130 | 3 | 2 | 186.0 |
| 2004 Q2 | 13,273 | 0 | 0 | 0.0 |
| 2004 Q1 | 4,660 | 0 | 0 | 0.0 |
| 2003 Q4 | 7,394 | 0 | 0 | 0.0 |
| 2003 Q3 | 7,632 | 0 | 0 | 0.0 |
| 2003 Q2 | 7,656 | 0 | 0 | 0.0 |
| 2003 Q1 | 3,577 | 1 | 0 | 279.6 |
| 2002 Q4 | 7,301 | 0 | 0 | 0.0 |
| 2002 Q3 | 9,416 | 0 | 0 | 0.0 |
| 2002 Q2 | 8,318 | 0 | 0 | 0.0 |
| 2002 Q1 | 2,012 | 0 | 0 | 0.0 |
| 2001 Q4 | 7,651 | 0 | 0 | 0.0 |
| 2001 Q3 | 8,751 | 11 | 8 | 1257.0 |
| 2001 Q2 | 8,262 | 0 | 0 | 0.0 |
| 2001 Q1 | 2,295 | 0 | 0 | 0.0 |
| 2000 Q4 | 7,319 | 0 | 0 | 0.0 |
| 2000 Q3 | 8,856 | 9 | 2 | 1016.3 |
| 2000 Q2 | 9,422 | 0 | 0 | 0.0 |
| 2000 Q1 | 5,083 | 0 | 0 | 0.0 |
Reportable incidents
17 on file2026 · 1 incident
2024 · 1 incident
While prepping cone crusher for backing replacement, Employee lacerated right knee requiring sutures. Employee was released to return to work with restrictions.
2014 · 1 incident
Employee was changing razor blade in utility. While removing blade from package, employee cut right thumb. Laceration required four (4) sutures.
2013 · 1 incident
While welding an iron flat bar to a structure at primary crusher a clamp failed and one end of bar struck employee on nose.
2009 · 1 incident
Injured employee was holding a drift pin while a second employee struck pin with a hammer. Second employee missed the pin striking injured employee on the left ring finger. Injured employee suffered fracture and laceration.
2004 · 2 incidents
WHILE ASCENDING LADDER ON FRONT LOADER, EE SLIPPED AND FELL TO GROUND, FRACTURING LOWER LEFT LEG.
WHILE REMOVING A FORM FROM NEWLY POURED CONCRETE STRUCTURE, EE STEPPED BACKWARDS ONTO LOOSE ROCK CAUSING ANKLE SPRAIN. (NOT REPORTED AS INJURED UNTIL 4/27/04 A.M.)
1998 · 1 incident
EE CUT FINGER WHILE STRIKING A RETURN ROLLER WITH A HAMMER TRYING TO REMOVE IT.
1997 · 1 incident
EE ALLEGES THAT HE WAS STRUCK IN THE RIGHT ANKLEBY A PIECE OF PIPE THAT WAS BEING MOVED BY A FRONT END LOADER.
1996 · 1 incident
EE ALLEGES THAT WHILE HE WAS STRIPPING LEDGE, THE BULLDOZER HE WAS OPERATING SLID SIDEWAYS AND STRUCK A ROCK THIS CAUSED THE MACHINE TO STOP SUDDENLY, STRAINING HIS BACK.
1995 · 1 incident
EMPLOYEE ALLEGES THAT WHILE LIFTING A GRAVITY TAKE UP IDLER INTO POSITION HE STRAINED HIS LOWER BACK. THIS EMPLOYEE MENTIONED THAT HE HAD ALL THE EQUIPMENT HE NEEDED TO HOIST THE IDLER INTO PLACE, INCLUDING THE MAN LIFT & CHAINS, BUT HE DECIDED TO LIFT IT INTO PLACE HIMSELF CAUSING HIM TO STRAIN HIS BACK.
1994 · 1 incident
EMPLOYEE ALLEGES THAT HE STRAINED OR TWISTED HIS RIGHT KNEE WHILE AT WORK ALTHOUGH HE SAYS HE DOESN'T KNOW WHEN OR HOW. HE CLAIMS THE PAIN COME & GOES. REPORTED INJURY ON 8-3 AND WENT TO FIR ST DR APPOINTMENT ON 8-18-94 WHEN HE WAS PLACE D ON A MODIFIED DUTY STATUS.
1992 · 4 incidents
EMPLOYEE ALLEGES THAT WHILE CHANGING THE DRILL COUPLING, THE HAMMER CAME DOWN AND STRUCK HIS FINGER.
EMPLOYEE ALLEGES THAT HE FELT A TINGLING IN HIS LOWER BACK WHICH GRADUALLY TURNED INTO PAIN AFTER HE LIFTED A STONE OFF THE SKIRT BARS AND LAID IT ONTO THE CONVEYOR BELT. WAS EVALUATED BY DOCT OR ON 9-5-92 AND DIAGNOSIS IS SEVERE LUMBAR STRAIN. PLACED ON LIGHT DUTY STATUS AS OF 9-8-92.
54736YEE ALLEGES THAT HIS DRILL STEEL STARTED TO FALL & WHEN HE REACHED TO GRAB IT HE FELT PAIN IN HIS LOWER BACK.
EMPLOYEE ALLEGES THAT WHILE WORKING ON A PIECE OF DISASSEMBLED EQUIPMENT, HE SOMEHOW KNOCKED THE MOTOR THAT WAS BEING STORED ABOVE FLOOR LEVEL OVER & CAUSED IT TO LAND ON HIS FOOT.
1989 · 1 incident
EE WAS CLEANING THE CHUTE OF THE CRUSHER WHEN HE SLIPPED AND GOT HIS FOOT CAUGHT IN THE CONVEYOR.
The full compliance file on Dracut MA Plant
A dated report covering the 26-year penalty trail, line-item violation pattern, contest and docket posture, rate-normalized peer benchmark, and full fatality history. Delivered as a PDF with the underlying data as CSV.