He was rolling a flat tire 11R22.5 up a ramp onto the back of an F350 service truck to take it back to the shop and when he got the tire to the top of the ramp and felt a pop in his back. He reported in the morning that he was having trouble getting moving and came to work late. his supervisor saw him later showing pain when moving and he went to get checked.
Milroy Aggregate Plant #6: 49 MSHA citations Metal/Non-Metal
Milroy Aggregate Plant #6 has $22K in proposed MSHA penalties and $0 outstanding across 2 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Milroy Aggregate Plant #6.
- Fatalities
- 0
- Total incidents
- 5
- Years on record
- 2000–2011
- Latest incident
- Jun 2011
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.Milroy Aggregate Plant #6 has $22K in proposed MSHA penalties and $0 outstanding across 2 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.ⓘ
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.- Settled 6 · 60%
- Vacated or withdrawn 4 · 40%
ⓘ
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.ⓘ
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.| Docket | Decision | Judge | Year | Proposed / upheld |
|---|---|---|---|---|
| PENN 2010-293M | Settlement | Harner | 2011 | $11K → $7K |
| PENN 2013-93M | Settlement | Harner | 2013 | $784 → $392 |
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.Metal and nonmetal contaminants (personal samples)
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.
Last sampled: 2017-02-28, 9 years ago
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.- Nuisance dust, total, <1% Qtz6
- Nuisance dust, respirable, <1% Qtz4
- Respirable dust, <.1mg3
- Arsenic fumes2
Show the individual readings (43)
| Date | Contaminant | Concentration | Limit | Conc / limit | Occupation |
|---|---|---|---|---|---|
| 2017-02-28 | Respirable dust, <.1mg | 0 | Bulldozer Operator | ||
| 2017-02-28 | Nuisance dust, total, <1% Qtz | 0 | 10 | 0.00 | Front-end Loader Operator |
| 2016-02-24 | Zinc oxide fumes | 0 | 5 | 0.00 | Welder, etc. |
| 2016-02-24 | Vanadium fumes | 0 | 50 | 0.00 | Welder, etc. |
| 2016-02-24 | Lead fumes | 0 | 150 | 0.00 | Welder, etc. |
| 2016-02-24 | Iron oxide fumes | 0.08 | 10 | 0.01 | Welder, etc. |
| 2016-02-24 | Molybdenum fumes | 0 | 10 | 0.00 | Welder, etc. |
| 2016-02-24 | Manganese fumes | 0.02 | 5 | 0.00 | Welder, etc. |
| 2016-02-24 | Magnesium oxide fumes | 0 | 10 | 0.00 | Welder, etc. |
| 2016-02-24 | Arsenic fumes | 0.4 | 500 | 0.00 | Welder, etc. |
| 2016-02-24 | Beryllium fumes | 0.01 | 2 | 0.01 | Welder, etc. |
| 2016-02-24 | Cadmium oxide fumes | 0 | 100 | 0.00 | Welder, etc. |
| 2016-02-24 | Chromium, insoluble | 0 | 1 | 0.00 | Welder, etc. |
| 2016-02-24 | Cobalt fumes | 0 | 100 | 0.00 | Welder, etc. |
| 2016-02-24 | Copper fumes | 0.17 | 100 | 0.00 | Welder, etc. |
| 2016-02-24 | Nickel fumes | 0 | 1 | 0.00 | Welder, etc. |
| 2010-11-18 | Nuisance dust, respirable, <1% Qtz | 0.16 | 10 | 0.02 | Laborer, Bullgang |
| 2010-11-18 | Quartz, respirable, >1% Qtz | 0.25 | 2.04 | 0.12 | Laborer, Bullgang |
| 2010-11-18 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2009-01-06 | Nickel fumes | 0 | 3 | 0.00 | Welder, etc. |
| 2009-01-06 | Arsenic fumes | 0 | 1500 | 0.00 | Welder, etc. |
| 2009-01-06 | Beryllium fumes | 0 | 6 | 0.00 | Welder, etc. |
| 2009-01-06 | Cadmium oxide fumes | 0 | 100 | 0.00 | Welder, etc. |
| 2009-01-06 | Chromium, insoluble | 0.01 | 3 | 0.00 | Welder, etc. |
| 2009-01-06 | Cobalt fumes | 0 | 300 | 0.00 | Welder, etc. |
| 2009-01-06 | Copper fumes | 0 | 300 | 0.00 | Welder, etc. |
| 2009-01-06 | Iron oxide fumes | 0.36 | 20 | 0.02 | Welder, etc. |
| 2009-01-06 | Lead fumes | 3.73 | 450 | 0.01 | Welder, etc. |
| 2009-01-06 | Magnesium oxide fumes | 0.03 | 20 | 0.00 | Welder, etc. |
| 2009-01-06 | Manganese fumes | 0.1 | 5 | 0.02 | Welder, etc. |
| 2009-01-06 | Molybdenum fumes | 0 | 20 | 0.00 | Welder, etc. |
| 2009-01-06 | Vanadium fumes | 0 | 50 | 0.00 | Welder, etc. |
| 2009-01-06 | Zinc oxide fumes | 0.02 | 10 | 0.00 | Welder, etc. |
| 2007-06-13 | Respirable dust, <.1mg | 0 | Drill Operator, Rotary | ||
| 2007-06-13 | Nuisance dust, respirable, <1% Qtz | 1.12 | 10 | 0.11 | Utility Man |
| 2005-09-13 | Nuisance dust, respirable, <1% Qtz | 0.19 | 10 | 0.02 | Front-end Loader Operator |
| 2005-09-13 | Nuisance dust, respirable, <1% Qtz | 0.12 | 10 | 0.01 | Truck Driver |
| 2005-09-13 | Quartz, respirable, >1% Qtz | 0.54 | 2.35 | 0.23 | Front-end Loader Operator |
| 2004-07-22 | Nuisance dust, total, <1% Qtz | 0.25 | 10 | 0.03 | Bulldozer Operator |
| 2004-07-22 | Nuisance dust, total, <1% Qtz | 0.18 | 10 | 0.02 | Front-end Loader Operator |
| 2004-07-22 | Nuisance dust, total, <1% Qtz | 0.3 | 10 | 0.03 | Crusher Oper/Worker |
| 2004-07-22 | Nuisance dust, total, <1% Qtz | 4.45 | 10 | 0.45 | Supervisor, Co. Official |
| 2004-07-22 | Nuisance dust, total, <1% Qtz | 0.68 | 10 | 0.07 | Front-end Loader Operator |
Milroy Aggregate Plant #6 recorded 0.00 reportable injury cases per 100 full-time workers in 2008.
ⓘ
This rate is reportable injury cases per 100 full-time-equivalent workers per year, computed as 200,000 times cases divided by MSHA operator-reported employee-hours. Cases are injuries MSHA graded degree 01 through 07; accident-only events that hurt no one are excluded, and so are contractor injuries, whose hours do not attach to a single mine. Rates begin in 2000, when quarterly employment reporting starts, and are withheld below 20,000 hours in a year.| Year | total case rate | days-away | fatal |
|---|---|---|---|
| 2008 * | 0.00 | 0.00 | 0.000 |
| 2007 * | 9.21 | 0.00 | 0.000 |
| 2005 * | 0.00 | 0.00 | 0.000 |
| 2004 * | 0.00 | 0.00 | 0.000 |
| 2003 * | 0.00 | 0.00 | 0.000 |
| 2002 * | 0.00 | 0.00 | 0.000 |
| 2001 * | 9.24 | 0.00 | 0.000 |
- Glenn O Hawbaker Inc 1996 to present
| Year | Employees |
|---|---|
| 2019 | 3 |
| 2018 | 3 |
| 2017 | 4 |
| 2016 | 8 |
| 2015 | 8 |
| 2014 | 5 |
| 2013 | 6 |
| 2012 | 6 |
| 2011 | 6 |
| 2010 | 6 |
| 2009 | 7 |
| 2008 | 10 |
| 2007 | 8 |
| 2006 | 8 |
| 2005 | 10 |
| 2004 | 10 |
| 2003 | 8 |
| 2002 | 10 |
| 2001 | 10 |
| 2000 | 8 |
Milroy Aggregate Plant #6 sits in Mifflin County, Pennsylvania, where the Census mining category is 0.4% of county employment.
ⓘ
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2019 Q1 | 513 | 0 | 0 | 0.0 |
| 2018 Q4 | 680 | 0 | 0 | 0.0 |
| 2018 Q3 | 1,049 | 0 | 0 | 0.0 |
| 2018 Q2 | 1,094 | 0 | 0 | 0.0 |
| 2018 Q1 | 2,219 | 2 | 0 | 901.3 |
| 2017 Q4 | 2,394 | 0 | 0 | 0.0 |
| 2017 Q3 | 2,222 | 0 | 0 | 0.0 |
| 2017 Q2 | 1,951 | 0 | 0 | 0.0 |
Show 68 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2017 Q1 | 2,272 | 0 | 0 | 0.0 |
| 2016 Q4 | 3,140 | 0 | 0 | 0.0 |
| 2016 Q3 | 5,456 | 1 | 0 | 183.3 |
| 2016 Q2 | 6,675 | 0 | 0 | 0.0 |
| 2016 Q1 | 4,099 | 1 | 1 | 244.0 |
| 2015 Q4 | 3,757 | 0 | 0 | 0.0 |
| 2015 Q3 | 7,326 | 3 | 0 | 409.5 |
| 2015 Q2 | 5,064 | 0 | 0 | 0.0 |
| 2015 Q1 | 3,561 | 1 | 0 | 280.8 |
| 2014 Q4 | 3,365 | 0 | 0 | 0.0 |
| 2014 Q3 | 3,411 | 1 | 0 | 293.2 |
| 2014 Q2 | 2,617 | 0 | 0 | 0.0 |
| 2014 Q1 | 2,405 | 1 | 0 | 415.8 |
| 2013 Q4 | 2,180 | 0 | 0 | 0.0 |
| 2013 Q3 | 2,917 | 0 | 0 | 0.0 |
| 2013 Q2 | 4,798 | 0 | 0 | 0.0 |
| 2013 Q1 | 2,034 | 0 | 0 | 0.0 |
| 2012 Q4 | 2,167 | 1 | 1 | 461.5 |
| 2012 Q3 | 2,181 | 1 | 0 | 458.5 |
| 2012 Q2 | 3,648 | 0 | 0 | 0.0 |
| 2012 Q1 | 4,123 | 3 | 2 | 727.6 |
| 2011 Q4 | 3,507 | 0 | 0 | 0.0 |
| 2011 Q3 | 3,169 | 0 | 0 | 0.0 |
| 2011 Q2 | 3,577 | 1 | 0 | 279.6 |
| 2011 Q1 | 3,229 | 0 | 0 | 0.0 |
| 2010 Q4 | 3,412 | 1 | 0 | 293.1 |
| 2010 Q3 | 3,590 | 2 | 0 | 557.1 |
| 2010 Q1 | 3,930 | 0 | 0 | 0.0 |
| 2009 Q4 | 3,270 | 11 | 4 | 3363.9 |
| 2009 Q3 | 5,275 | 7 | 6 | 1327.0 |
| 2009 Q2 | 4,897 | 0 | 0 | 0.0 |
| 2009 Q1 | 3,474 | 0 | 0 | 0.0 |
| 2008 Q4 | 4,787 | 0 | 0 | 0.0 |
| 2008 Q3 | 5,941 | 0 | 0 | 0.0 |
| 2008 Q2 | 7,501 | 0 | 0 | 0.0 |
| 2008 Q1 | 9,186 | 0 | 0 | 0.0 |
| 2007 Q4 | 5,599 | 1 | 0 | 178.6 |
| 2007 Q3 | 5,801 | 0 | 0 | 0.0 |
| 2007 Q2 | 7,039 | 0 | 0 | 0.0 |
| 2007 Q1 | 3,278 | 0 | 0 | 0.0 |
| 2006 Q4 | 4,373 | 2 | 0 | 457.4 |
| 2006 Q3 | 4,884 | 0 | 0 | 0.0 |
| 2006 Q2 | 6,246 | 2 | 1 | 320.2 |
| 2006 Q1 | 3,887 | 0 | 0 | 0.0 |
| 2005 Q4 | 8,269 | 0 | 0 | 0.0 |
| 2005 Q3 | 7,650 | 0 | 0 | 0.0 |
| 2005 Q2 | 7,014 | 0 | 0 | 0.0 |
| 2005 Q1 | 5,048 | 0 | 0 | 0.0 |
| 2004 Q4 | 5,173 | 0 | 0 | 0.0 |
| 2004 Q3 | 6,688 | 0 | 0 | 0.0 |
| 2004 Q2 | 6,762 | 0 | 0 | 0.0 |
| 2004 Q1 | 5,408 | 0 | 0 | 0.0 |
| 2003 Q4 | 4,678 | 0 | 0 | 0.0 |
| 2003 Q3 | 4,825 | 0 | 0 | 0.0 |
| 2003 Q2 | 6,432 | 0 | 0 | 0.0 |
| 2003 Q1 | 6,581 | 1 | 0 | 152.0 |
| 2002 Q4 | 6,147 | 0 | 0 | 0.0 |
| 2002 Q3 | 7,181 | 0 | 0 | 0.0 |
| 2002 Q2 | 5,786 | 0 | 0 | 0.0 |
| 2002 Q1 | 5,899 | 0 | 0 | 0.0 |
| 2001 Q4 | 5,161 | 0 | 0 | 0.0 |
| 2001 Q3 | 7,239 | 0 | 0 | 0.0 |
| 2001 Q2 | 5,532 | 0 | 0 | 0.0 |
| 2001 Q1 | 3,705 | 3 | 0 | 809.7 |
| 2000 Q4 | 4,593 | 0 | 0 | 0.0 |
| 2000 Q3 | 4,818 | 0 | 0 | 0.0 |
| 2000 Q2 | 4,946 | 0 | 0 | 0.0 |
| 2000 Q1 | 2,830 | 0 | 0 | 0.0 |
Reportable incidents
5 on file2011 · 2 incidents
They where changing the impact bars in our secondary crusher and a piece of metal flew off of the shoe that holds the bar in flying into the EE's leg on his right hip. Fine material will get packed in around the shoes and the EE was hitting the shoe with a 4 pound hammer to knock the fines out when a sliver flew off the side and was imbedded into his leg.
2007 · 1 incident
Carrying empty totes in loader down hill for disposal when one fell out of bucket and went under it. He backed up and got out to put it back in. He lifted it up and went to push it in when his hand slid cutting his arm.
2001 · 1 incident
LIFTING A PIECE OF METAL WITH COME ALONG. HOOK SLIPPED OFF OF METAL. HOOK STRUCK RIGHT RING FINGER, CAUSING A CUT TO RIGHT RING FINGER.
2000 · 1 incident
A REMOVABLE PIECE OF CATWALK LEFT UNSECURED WAS STEPPED ON A GIVING WAY & ALLOWING LEG TO SLIP THRU