Dust hose to the dust collector pot became full of mud. EE removed the hose at the lower point to to clear it. The hose fell off. employee continued to unclog the hose by elevating it the middle. EE ended up moving hose off to the side to allow it time to dry out. The next day EE returned to installed it. The employee said EE did not need medical attention till 4-22-26
Bonner Springs Quarry Metal/Non-Metal
Bonner Springs Quarry has $58K in proposed MSHA penalties and $360 outstanding across 12 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Bonner Springs Quarry.
- Fatalities
- 0
- Total incidents
- 8
- Years on record
- 1995–2026
- Latest incident
- Apr 2026
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.Bonner Springs Quarry has $58K in proposed MSHA penalties and $360 outstanding across 12 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2025 Q4 | 8,834 | 0 | 0 | 0.0 |
| 2025 Q3 | 9,423 | 0 | 0 | 0.0 |
| 2025 Q2 | 8,330 | 5 | 0 | 600.2 |
| 2025 Q1 | 7,786 | 0 | 0 | 0.0 |
| 2024 Q4 | 7,964 | 5 | 0 | 627.8 |
| 2024 Q3 | 8,450 | 0 | 0 | 0.0 |
| 2024 Q2 | 10,708 | 1 | 0 | 93.4 |
| 2024 Q1 | 8,543 | 0 | 0 | 0.0 |
Show 96 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2023 Q4 | 7,528 | 2 | 1 | 265.7 |
| 2023 Q3 | 8,886 | 0 | 0 | 0.0 |
| 2023 Q2 | 6,383 | 1 | 0 | 156.7 |
| 2023 Q1 | 5,687 | 0 | 0 | 0.0 |
| 2022 Q4 | 5,114 | 5 | 2 | 977.7 |
| 2022 Q3 | 5,156 | 4 | 3 | 775.8 |
| 2022 Q2 | 5,156 | 0 | 0 | 0.0 |
| 2022 Q1 | 5,120 | 3 | 1 | 585.9 |
| 2021 Q4 | 5,156 | 0 | 0 | 0.0 |
| 2021 Q3 | 5,088 | 3 | 1 | 589.6 |
| 2021 Q2 | 5,088 | 0 | 0 | 0.0 |
| 2021 Q1 | 5,088 | 1 | 0 | 196.5 |
| 2020 Q4 | 5,087 | 0 | 0 | 0.0 |
| 2020 Q3 | 5,088 | 1 | 0 | 196.5 |
| 2020 Q2 | 4,407 | 0 | 0 | 0.0 |
| 2020 Q1 | 2,385 | 2 | 0 | 838.6 |
| 2019 Q4 | 4,957 | 0 | 0 | 0.0 |
| 2019 Q3 | 4,372 | 0 | 0 | 0.0 |
| 2019 Q2 | 5,541 | 0 | 0 | 0.0 |
| 2019 Q1 | 4,480 | 2 | 0 | 446.4 |
| 2018 Q4 | 4,417 | 0 | 0 | 0.0 |
| 2018 Q3 | 5,896 | 0 | 0 | 0.0 |
| 2018 Q2 | 2,328 | 5 | 1 | 2147.8 |
| 2018 Q1 | 2,484 | 2 | 0 | 805.2 |
| 2017 Q4 | 4,041 | 0 | 0 | 0.0 |
| 2017 Q3 | 5,052 | 0 | 0 | 0.0 |
| 2017 Q2 | 6,678 | 4 | 1 | 599.0 |
| 2017 Q1 | 6,545 | 0 | 0 | 0.0 |
| 2016 Q4 | 8,024 | 3 | 1 | 373.9 |
| 2016 Q3 | 7,028 | 7 | 1 | 996.0 |
| 2016 Q2 | 5,562 | 0 | 0 | 0.0 |
| 2016 Q1 | 6,927 | 3 | 0 | 433.1 |
| 2015 Q4 | 5,489 | 0 | 0 | 0.0 |
| 2015 Q3 | 6,187 | 7 | 2 | 1131.4 |
| 2015 Q2 | 6,865 | 0 | 0 | 0.0 |
| 2015 Q1 | 5,288 | 2 | 0 | 378.2 |
| 2014 Q4 | 5,144 | 0 | 0 | 0.0 |
| 2014 Q3 | 7,140 | 31 | 9 | 4341.7 |
| 2014 Q2 | 6,863 | 0 | 0 | 0.0 |
| 2014 Q1 | 5,868 | 0 | 0 | 0.0 |
| 2013 Q4 | 5,245 | 0 | 0 | 0.0 |
| 2013 Q3 | 5,671 | 0 | 0 | 0.0 |
| 2013 Q2 | 4,875 | 0 | 0 | 0.0 |
| 2013 Q1 | 4,973 | 0 | 0 | 0.0 |
| 2012 Q4 | 4,163 | 1 | 1 | 240.2 |
| 2012 Q3 | 5,100 | 0 | 0 | 0.0 |
| 2012 Q2 | 4,695 | 3 | 2 | 639.0 |
| 2012 Q1 | 1,883 | 3 | 0 | 1593.2 |
| 2011 Q4 | 4,095 | 0 | 0 | 0.0 |
| 2011 Q3 | 5,303 | 0 | 0 | 0.0 |
| 2011 Q2 | 7,664 | 3 | 1 | 391.4 |
| 2011 Q1 | 5,556 | 0 | 0 | 0.0 |
| 2010 Q4 | 10,752 | 0 | 0 | 0.0 |
| 2010 Q3 | 8,962 | 3 | 1 | 334.7 |
| 2010 Q2 | 868 | 0 | 0 | 0.0 |
| 2010 Q1 | 7,161 | 0 | 0 | 0.0 |
| 2009 Q4 | 8,068 | 18 | 4 | 2231.0 |
| 2009 Q3 | 9,310 | 0 | 0 | 0.0 |
| 2009 Q2 | 8,209 | 4 | 1 | 487.3 |
| 2009 Q1 | 8,039 | 4 | 1 | 497.6 |
| 2008 Q4 | 10,581 | 0 | 0 | 0.0 |
| 2008 Q3 | 16,145 | 0 | 0 | 0.0 |
| 2008 Q2 | 13,323 | 3 | 1 | 225.2 |
| 2008 Q1 | 11,527 | 0 | 0 | 0.0 |
| 2007 Q4 | 10,900 | 7 | 2 | 642.2 |
| 2007 Q3 | 16,990 | 0 | 0 | 0.0 |
| 2007 Q2 | 15,849 | 0 | 0 | 0.0 |
| 2007 Q1 | 13,502 | 0 | 0 | 0.0 |
| 2006 Q4 | 14,691 | 3 | 0 | 204.2 |
| 2006 Q3 | 19,108 | 0 | 0 | 0.0 |
| 2006 Q2 | 20,170 | 2 | 1 | 99.2 |
| 2006 Q1 | 20,678 | 0 | 0 | 0.0 |
| 2005 Q4 | 19,866 | 1 | 0 | 50.3 |
| 2005 Q3 | 17,150 | 0 | 0 | 0.0 |
| 2005 Q2 | 16,748 | 0 | 0 | 0.0 |
| 2005 Q1 | 17,540 | 0 | 0 | 0.0 |
| 2004 Q4 | 16,460 | 3 | 0 | 182.3 |
| 2004 Q3 | 17,835 | 0 | 0 | 0.0 |
| 2004 Q2 | 16,925 | 0 | 0 | 0.0 |
| 2004 Q1 | 14,965 | 0 | 0 | 0.0 |
| 2003 Q4 | 14,040 | 3 | 0 | 213.7 |
| 2003 Q3 | 15,940 | 2 | 0 | 125.5 |
| 2003 Q2 | 14,995 | 0 | 0 | 0.0 |
| 2003 Q1 | 12,865 | 0 | 0 | 0.0 |
| 2002 Q4 | 13,532 | 0 | 0 | 0.0 |
| 2002 Q3 | 15,620 | 0 | 0 | 0.0 |
| 2002 Q2 | 14,545 | 0 | 0 | 0.0 |
| 2002 Q1 | 12,430 | 2 | 0 | 160.9 |
| 2001 Q4 | 14,038 | 0 | 0 | 0.0 |
| 2001 Q3 | 15,630 | 0 | 0 | 0.0 |
| 2001 Q2 | 14,060 | 0 | 0 | 0.0 |
| 2001 Q1 | 12,307 | 5 | 0 | 406.3 |
| 2000 Q4 | 9,855 | 0 | 0 | 0.0 |
| 2000 Q3 | 14,711 | 0 | 0 | 0.0 |
| 2000 Q2 | 15,065 | 0 | 0 | 0.0 |
| 2000 Q1 | 15,617 | 1 | 0 | 64.0 |
Reportable incidents
8 on file2026 · 2 incidents
Employee was underneath an articulated haul truck setting jacks and cribbing. The job site was very muddy and while twisting and grabbing equipment they felt their left knee pop. Called nurse triage, they advised visiting urgent care. Doctor orders from urgent care stated employee needed to be off of the appendage and work until an MRI can be taken. MRI scheduled through work comp.
2020 · 1 incident
Not a miner, Commercial DOT Driver, Driver had staged truck in the front parking lot. The driver was climbing out of the truck and lost grip. Tried to catch self and separated shoulder.
2018 · 1 incident
Employee was walking on ground level pathway when the employee slipped on surface and fell to ground. Employee straightened left leg out and felt pop. Employee worked rest of shift. Was seen by doctor approximately 7:00pm that night and was diagnosed with a dislocated left patella. Put in brace and given prescription and was released to light duty.
2016 · 1 incident
EE had surgery to repair an elbow tendon tare on 1/14/16 for an incident that occurred in March of 2014. EE believed the injury to be minor at the time and did not seek treatment or report to EHS. EE reported the incident in July of 2015 and a WC claim was filed. Ins. Co. investigated the claim and accepted claim in Dec of 2015 scheduling surgery on 1/14/16. Expect 10-14 LTD.
1998 · 1 incident
WHILE ATTEMPTING TO START THE POWER PLANT ON THE CRUSHER CONVEYOR, INJURED TAPPED A CAN OF ETHER (STARTING FLUID) ON THE SELENOID. THE CAN BURST AND THE PROPELLANT IGNITED.
1996 · 1 incident
EE WAS OPERATING A DOZER ON THE QUARRY SITE WHEN A BEE FLEW INTO THE CAB OF THE DOZER. THE EE IS ALLERGIC TO BEE STINGS. HE WAS TAKEN TO THE HOSPITAL WHERE HE WAS GIVEN AN INJECTION AND RELEAS ED.
1995 · 1 incident
EE WAS ATTACHING ANOTHER STEEL TO A DRILL RIG BIT WHEN HIS GLOVE CAUGHT ON THE STEEL & TWISTED HIS LEFT WRIST. HIS WRIST WAS SPRAINED, WITH NO PERMANENT IMPAIRMENT. ALTHOUGH HE REPORTED HIS IN JURY THE DAY IT OCCURRED, THE COMPANY WAS NOT AWARE HE HAD SOUGHT TREATMENT UNTIL A BILL WAS RECIEVED ON APRIL 7, 1995.
The full compliance file on Bonner Springs Quarry