Employee was changing screens using hand tools, ratchet and socket.
Campton Sand & Gravel C616: 24 MSHA citations Metal/Non-Metal
Campton Sand & Gravel C616 has $3K in proposed MSHA penalties and $59 outstanding across 1 contested dockets, plus health sampling and the full incident record.
Watch this mine
Email me when a new MSHA incident is filed at Campton Sand & Gravel C616.
- Fatalities
- 0
- Total incidents
- 12
- Years on record
- 1986–2008
- Latest incident
- Aug 2008
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.ⓘ
A Section 107(a) order removes miners from an area when an inspector finds an imminent danger. Each order is lifted once the condition is corrected, so this counts orders issued, not orders now in effect.Campton Sand & Gravel C616 has $3K in proposed MSHA penalties and $59 outstanding across 1 contested dockets.
ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.ⓘ
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.- Vacated or withdrawn 1 · 100%
ⓘ
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.| Docket | Decision | Judge | Year | Proposed / upheld |
|---|---|---|---|---|
| YORK 2013-71M | Withdrawal | Barbour | 2013 | $108 → $0 |
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.Metal and nonmetal contaminants (personal samples)
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.
Last sampled: 2011-10-13, 14 years ago
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.- Quartz, respirable, >1% Qtz10
- Respirable dust, <.1mg6
Show the individual readings (16)
| Date | Contaminant | Concentration | Limit | Conc / limit | Occupation |
|---|---|---|---|---|---|
| 2011-10-13 | Quartz, respirable, >1% Qtz | 0.15 | 0.76 | 0.20 | Front-end Loader Operator |
| 2007-09-18 | Quartz, respirable, >1% Qtz | 0.18 | 0.4 | 0.45 | Crusher Oper/Worker |
| 2007-09-18 | Quartz, respirable, >1% Qtz | 0.19 | 0.35 | 0.54 | Crusher Oper/Worker |
| 2007-09-18 | Quartz, respirable, >1% Qtz | 0.33 | 0.84 | 0.39 | Crusher Oper/Worker |
| 2007-09-18 | Quartz, respirable, >1% Qtz | 0.2 | 1.1 | 0.18 | Crusher Oper/Worker |
| 2007-09-18 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2006-05-04 | Respirable dust, <.1mg | 0 | Crusher Oper/Worker | ||
| 2006-05-04 | Respirable dust, <.1mg | 0 | Washer Operator | ||
| 2006-05-04 | Quartz, respirable, >1% Qtz | 0.13 | 0.47 | 0.28 | Utility Man |
| 2002-08-28 | Quartz, respirable, >1% Qtz | 0.13 | 0.65 | 0.20 | Crusher Oper/Worker |
| 2002-08-28 | Respirable dust, <.1mg | 0 | Laborer, Bullgang | ||
| 2002-08-28 | Respirable dust, <.1mg | 0 | Crusher Oper/Worker | ||
| 2000-10-25 | Respirable dust, <.1mg | 0 | Front-end Loader Operator | ||
| 2000-10-25 | Quartz, respirable, >1% Qtz | 0.18 | 0.28 | 0.64 | Washer Operator |
| 2000-10-25 | Quartz, respirable, >1% Qtz | 0.26 | 0.77 | 0.34 | Crusher Oper/Worker |
| 2000-10-25 | Quartz, respirable, >1% Qtz | 0.17 | 0.23 | 0.74 | Utility Man |
Campton Sand & Gravel C616 recorded 0.00 reportable injury cases per 100 full-time workers in 2007.
ⓘ
This rate is reportable injury cases per 100 full-time-equivalent workers per year, computed as 200,000 times cases divided by MSHA operator-reported employee-hours. Cases are injuries MSHA graded degree 01 through 07; accident-only events that hurt no one are excluded, and so are contractor injuries, whose hours do not attach to a single mine. Rates begin in 2000, when quarterly employment reporting starts, and are withheld below 20,000 hours in a year.| Year | total case rate | days-away | fatal |
|---|---|---|---|
| 2007 * | 0.00 | 0.00 | 0.000 |
| 2004 * | 9.38 | 0.00 | 0.000 |
| 2003 * | 0.00 | 0.00 | 0.000 |
| 2001 * | 0.00 | 0.00 | 0.000 |
| 2000 * | 0.00 | 0.00 | 0.000 |
- Campton Sand & Gravel Inc 1950 to 1986
- Campton Sand & Gravel 1986 to 1996
- Pike Industries Inc 1997 to present
| Year | Employees |
|---|---|
| 2018 | 0 |
| 2017 | 0 |
| 2016 | 2 |
| 2015 | 3 |
| 2014 | 2 |
| 2013 | 4 |
| 2012 | 4 |
| 2011 | 6 |
| 2010 | 6 |
| 2009 | 7 |
| 2008 | 9 |
| 2007 | 11 |
| 2006 | 9 |
| 2005 | 7 |
| 2004 | 12 |
| 2003 | 10 |
| 2002 | 12 |
| 2001 | 16 |
| 2000 | 10 |
Campton Sand & Gravel C616 sits in Grafton County, New Hampshire, where the Census mining category is 0.0% of county employment.
ⓘ
County figures come from the US Census Bureau's American Community Survey, 5-year pooled estimates, so the 2023 vintage covers 2019 through 2023. The Census category is 'mining, quarrying, and oil and gas extraction', which is broader than MSHA jurisdiction and includes oil and gas workers no mine employs. These figures describe the surrounding county, not this mine, and are not a factor in any specific incident.ⓘ
Citations per million reported employee-hours. Rates begin in 2000, when MSHA's quarterly employment data starts; earlier incidents are counted but cannot be rate-adjusted. Quarters under 100,000 reported hours are greyed: too few hours for a stable rate.| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2018 Q4 | 0 | 0 | 0 | |
| 2018 Q3 | 8 | 0 | 0 | 0.0 |
| 2018 Q2 | 0 | 0 | 0 | |
| 2018 Q1 | 0 | 0 | 0 | |
| 2017 Q2 | 0 | 0 | 0 | |
| 2017 Q1 | 0 | 0 | 0 | |
| 2016 Q4 | 26 | 0 | 0 | 0.0 |
| 2016 Q3 | 12 | 0 | 0 | 0.0 |
Show 66 earlier quarters Hide earlier quarters
| Quarter | Hours worked | Citations | S&S | Per 1M hrs |
|---|---|---|---|---|
| 2016 Q2 | 16 | 0 | 0 | 0.0 |
| 2016 Q1 | 223 | 0 | 0 | 0.0 |
| 2015 Q4 | 1,427 | 0 | 0 | 0.0 |
| 2015 Q3 | 1,227 | 0 | 0 | 0.0 |
| 2015 Q2 | 782 | 0 | 0 | 0.0 |
| 2015 Q1 | 670 | 1 | 0 | 1492.5 |
| 2014 Q4 | 1,106 | 0 | 0 | 0.0 |
| 2014 Q3 | 1,277 | 0 | 0 | 0.0 |
| 2014 Q2 | 770 | 0 | 0 | 0.0 |
| 2014 Q1 | 807 | 0 | 0 | 0.0 |
| 2013 Q4 | 1,164 | 0 | 0 | 0.0 |
| 2013 Q3 | 1,983 | 0 | 0 | 0.0 |
| 2013 Q2 | 1,509 | 0 | 0 | 0.0 |
| 2013 Q1 | 804 | 0 | 0 | 0.0 |
| 2012 Q4 | 1,293 | 3 | 1 | 2320.2 |
| 2012 Q3 | 2,263 | 0 | 0 | 0.0 |
| 2012 Q2 | 1,384 | 0 | 0 | 0.0 |
| 2012 Q1 | 1,234 | 0 | 0 | 0.0 |
| 2011 Q4 | 1,859 | 0 | 0 | 0.0 |
| 2011 Q3 | 3,321 | 2 | 0 | 602.2 |
| 2011 Q2 | 1,917 | 0 | 0 | 0.0 |
| 2011 Q1 | 1,230 | 0 | 0 | 0.0 |
| 2010 Q4 | 2,267 | 0 | 0 | 0.0 |
| 2010 Q3 | 3,096 | 3 | 2 | 969.0 |
| 2010 Q2 | 2,016 | 0 | 0 | 0.0 |
| 2010 Q1 | 1,278 | 0 | 0 | 0.0 |
| 2009 Q4 | 3,113 | 0 | 0 | 0.0 |
| 2009 Q3 | 4,027 | 3 | 1 | 745.0 |
| 2009 Q2 | 1,472 | 0 | 0 | 0.0 |
| 2009 Q1 | 903 | 0 | 0 | 0.0 |
| 2008 Q4 | 4,178 | 0 | 0 | 0.0 |
| 2008 Q3 | 5,709 | 2 | 0 | 350.3 |
| 2008 Q2 | 4,123 | 0 | 0 | 0.0 |
| 2008 Q1 | 1,712 | 0 | 0 | 0.0 |
| 2007 Q4 | 4,643 | 0 | 0 | 0.0 |
| 2007 Q3 | 6,976 | 4 | 0 | 573.4 |
| 2007 Q2 | 5,513 | 0 | 0 | 0.0 |
| 2007 Q1 | 2,869 | 0 | 0 | 0.0 |
| 2006 Q4 | 5,378 | 0 | 0 | 0.0 |
| 2006 Q3 | 5,518 | 0 | 0 | 0.0 |
| 2006 Q2 | 5,960 | 2 | 0 | 335.6 |
| 2006 Q1 | 2,954 | 0 | 0 | 0.0 |
| 2005 Q4 | 4,723 | 0 | 0 | 0.0 |
| 2005 Q3 | 6,111 | 0 | 0 | 0.0 |
| 2005 Q2 | 5,017 | 0 | 0 | 0.0 |
| 2005 Q1 | 2,259 | 0 | 0 | 0.0 |
| 2004 Q4 | 4,148 | 0 | 0 | 0.0 |
| 2004 Q3 | 6,431 | 0 | 0 | 0.0 |
| 2004 Q2 | 7,271 | 1 | 0 | 137.5 |
| 2004 Q1 | 3,475 | 0 | 0 | 0.0 |
| 2003 Q4 | 4,713 | 0 | 0 | 0.0 |
| 2003 Q3 | 4,794 | 0 | 0 | 0.0 |
| 2003 Q2 | 11,397 | 0 | 0 | 0.0 |
| 2003 Q1 | 3,532 | 0 | 0 | 0.0 |
| 2002 Q4 | 5,944 | 0 | 0 | 0.0 |
| 2002 Q3 | 3,140 | 1 | 0 | 318.5 |
| 2002 Q2 | 8,351 | 0 | 0 | 0.0 |
| 2002 Q1 | 1,872 | 0 | 0 | 0.0 |
| 2001 Q4 | 6,633 | 0 | 0 | 0.0 |
| 2001 Q3 | 7,663 | 0 | 0 | 0.0 |
| 2001 Q2 | 7,890 | 0 | 0 | 0.0 |
| 2001 Q1 | 5,020 | 0 | 0 | 0.0 |
| 2000 Q4 | 5,567 | 1 | 0 | 179.6 |
| 2000 Q3 | 6,487 | 0 | 0 | 0.0 |
| 2000 Q2 | 6,325 | 0 | 0 | 0.0 |
| 2000 Q1 | 2,725 | 0 | 0 | 0.0 |
Reportable incidents
12 on file2008 · 1 incident
2004 · 1 incident
Employee states that the swivel knob on the steering wheel has caused pressure to palm
1998 · 1 incident
WHILE WALKING IN YARD TO THE LOADER, HE SLIPPED AND FELL ON HIS SIDE DUE TO SNOW AND ICE.
1990 · 1 incident
HE WAS WORKING ON WASH PLANT-HELPING TO REPAIR PLATES ON MATERIALS BIN WHEN HE STRUCK HIS LEFT INDEX FINGER WITH THE HAMMER HE WAS USING.
1989 · 3 incidents
SLIPPED ON CAT WALK.
SLIPPED ON WET CONVEYOR BELT.
HAMMERING ON PIECE OF STEEL WITH HAMMER,GOT SLIVER OF STEEL IN LEFT HAND.
1987 · 4 incidents
THIS WAS CAUSED3FROM THE FUMES COMING FROM PIKE S DRUM PLANT DOWN BACK. THEY DID NOT HAVE ENOUGH TRUCKS TO KEEP THE PLANT RUNNNG STEADY, SO WHEN THEY FIRED UP THE PLANT, THE FUMES CAME UP FORM XX FROM THE PLA3T. THE WIND WAS BLWOING FROM THE SOUTH AND THE FUMES FROM THE UNBURNED FUEL BURNED HIS THROAT. THE PIKE PLANT IS NOW CLOSED FOR THE SEASON.
PUTTING DRIVE B9LTS ON SHEVES AND CAUGHT FINGERS BETWEEN BELTS AND SHEVE. THE BELT ROLLED BACK.
LOADING CULVERT3PIPE AND TRIPPED FELL OVER COLLARS HURTING RIGHT HIP.
CLIMBING OUT OF3THE SCREEN DECK OF THE WASH PLANT, SLIPPED AND FELL AGAINST THE EDGE OF THE DECK.
1986 · 1 incident
WAS PUTTING NEW3BOLTS IN 5/16" SCREEN AND WHEN COMING BACK OUT, HE SLIPPED ON WET STEEL AND FELL INTO CHUTE HEAD FIRST.