On August 13, 2026, a miner died after falling from a hopper onto an overland belt conveyor and becoming engulfed by material from the hopper.
Granite Construction Inc: 1 recorded fatality controller
Watch this controller
Email me when a new MSHA incident is filed at any mine Granite Construction Inc controls.
GRANITE CONSTRUCTION INC (GVA) discloses mines under this controller in its SEC Dodd-Frank Section 1503 (EX-95) mine-safety filings.
ⓘ
This rate is recorded citations divided by MSHA inspection hours, per 100 hours. It reflects inspection effort, not mine size or production.ⓘ
A Section 107(a) order removes miners from an area when an inspector finds an imminent danger. Each order is lifted once the condition is corrected, so this counts orders issued, not orders now in effect.ⓘ
Differences between proposed and paid penalties reflect both settlements and conference reductions and amounts still owed. Outstanding is the balance currently owed.ⓘ
Shares are computed over citations that carry the MSHA gravity and negligence coding; a small share of records are uncoded.ⓘ
This rate is reportable injury cases per 100 full-time-equivalent workers per year, computed as 200,000 times cases divided by MSHA operator-reported employee-hours. Cases are injuries MSHA graded degree 01 through 07; accident-only events that hurt no one are excluded, and so are contractor injuries, whose hours do not attach to a single mine. Rates begin in 2000, when quarterly employment reporting starts, and are withheld below 20,000 hours in a year.| Year | total case rate | days-away | fatal |
|---|---|---|---|
| 2026 | 1.38 | 0.35 | 0.000 |
| 2025 | 0.47 | 0.00 | 0.000 |
| 2024 | 0.81 | 0.27 | 0.000 |
| 2023 | 0.67 | 0.00 | 0.000 |
| 2022 | 0.00 | 0.00 | 0.000 |
| 2021 | 0.76 | 0.38 | 0.000 |
| 2020 | 0.00 | 0.00 | 0.000 |
| 2019 | 0.38 | 0.00 | 0.000 |
ⓘ
A sample is a point in time compliance measurement, not an individual exposure history. These figures describe MSHA sampling records and do not establish causation or personal dose.Metal and nonmetal contaminants (personal samples)
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.
Last sampled: 2026-08-13
ⓘ
Many samples are screening measurements of substances with no applicable exposure limit; they are counted as samples but excluded from every over-limit figure. Over-limit shares use only limit-tested samples.- Quartz, respirable, >1% Qtz26635 over
- Nuisance dust, total, <1% Qtz53 over
- Respirable dust, <.1mg202
- Unlisted Particulate, respirable, <1% Qtz21
Area samples (mill and shop air)
Last sampled: 2023-11-02ⓘ
Contesting a citation before the Federal Mine Safety and Health Review Commission is a lawful right. These figures state the public outcomes of that process, from MSHA's Contested Violations file.- Settled 57 · 77%
- Stood as issued 15 · 20%
- Vacated or withdrawn 2 · 3%
ⓘ
Counts a Significant & Substantial citation as surviving when a settlement or judge's decision kept the designation, or the contest was dismissed or defaulted so the citation stands as issued. Vacated and withdrawn citations, and settlements that removed the designation, count against.ⓘ
A reduction or dismissal at the Commission is a lawful outcome of contesting a proposed penalty. Figures are the proposed amount and the amount upheld in the docket's decision.| Docket | Decision | Judge | Year | Proposed / upheld |
|---|---|---|---|---|
| WEST 2008-502M | Settlement | Bulluck | 2011 | $60K → $21K |
| WEST 2005-91M | Settlement | Lesnick | 2005 | $42K → $20K |
| WEST 2010-1566M | Dismissal | Bulluck | 2011 | $19K → $19K |
| WEST 2011-1141M | Settlement | Lesnick | 2012 | $2K → $2K |
| WEST 2011-223M | Settlement | Andrews | 2011 | $2K → $1K |
| WEST20020090M | Settlement | Manning | 2002 | $2K → $1K |
Top causes
- FALLING/SLIDING/ROLLING MATERIALS 1 fatality · 1 non-fatal
- HANDLING OF MATERIALS 105 non-fatal
- SLIP OR FALL OF PERSON 70 non-fatal
- MACHINERY 62 non-fatal
- HANDTOOLS (NONPOWERED) 58 non-fatal
- POWERED HAULAGE 52 non-fatal
Incident timeline
Operators under this controller
- Granite Construction Company 335
- Intermountain Slurry Seal Inc 14
- Nikolaus & Nikolaus Inc 9
- California Iss Inc 5
- North Coast Paving & Rock 5
- Vulcan Materials Company 5
- Concrete Products Co-Div/Gibbons & Reed Company 4
- Memphis Stone & Gravel Company 4
- Parnum Paving Inc 4
- Calmat Company 2
- Bear River Contractors 1
- Cal-Ci-Co Rock Company Inc 1
- Cinderlite Aggregates 1
- Hi Desert Concrete Products Inc 1
- Redwood Empire Aggregates 1
- Robinson Construction Company Inc 1
- Wilder Construction Company 1
Mines on record
- DAYTON MATERIALS NV
- Brunswick Canyon NV
- Portable Plant #3 AK
- Goni Pit NV
- Love Pit MS
- Desoto MS
- SWAN PIT AZ
- Capay Plant Facility CA
- Lockwood Quarry NV
- Felton Quarry CA
- Conrock North Pit AK
- Tangerine Road Pit AZ
- Coalinga Pit CA
- Highway 175 Quarry CA
- Portable Plant #5 UT
- Wells Pit UT
- Whatcom Portable Mill WA
- Vernalis Plant CA
- Washington Portable 1 WA
- Bee Rock Quarry CA
- Arvin Pit CA
- Bradshaw CA
- Walker Sand & Gravel Pit UT
- FOUNTAIN SPRINGS CA
- West Dowling Road Mill AK
- Lee Vining Aggregate Plant CA
- #1 Portable Crusher AK
- HJ HOVE CA
- #2 Portable Crusher AK
- Handley Ranch Quarry CA
- Jimenez CA
- Freeman Quarry CA
- Tracy Pit CA
- Portable Crusher #1 UT
- ROBERT E HOVE PIT CA
- Pacific Heights Pit CA
- Graham Pit & Mill CA
- Five Bridges Aggregate Plant CA
- Ridgecrest Rock Plant CA
- Shuster Quarry CA
- Portable #4 AZ
- El Centro CA
- Portable Crusher #4 UT
- Apex Pit NV
- Portable Crusher #3 UT
- AMMEX CA
- WHITEHILL SAND & GRAVEL UT
- Parleys Canyon Pit UT
- Littlerock CA
- Terra Bella Quarry CA
- MCCARREN PIT NV
- U-DOT PIT UT
- Tucson Portable AZ
- Portable #2 AZ
- Mendocino Aggregates CA
- 2200 NORTH WASH PLANT UT
- IUKA QUARRY MS
- Red Rock Quarry CA
- Smith River Pit & Mill CA
- Hughes Pit AZ
- Poway Plant CA
- Woodland Pit CA
- James Road Pit CA
- Mt St Helens Mill WA
- Del Monte Quarry CA
- Perkins Pit And Mill CA
Preliminary fatality notice
Official record pendingMSHA has published a preliminary fatality notice at a mine under this company's control. The investigated official record typically follows one to six months after the accident; this page will carry it once MSHA releases it.
Fatalities under this controller
1 recordedEmployee entered a trench and was struck by a large section of clay when a vertical wall of the trench collapsed.
Where Granite Construction Inc stands on silica, penalties, and injury rate
MSHA's standard limits respirable silica to 50 micrograms per cubic metre, but MSHA publishes dust and quartz as separate files and never the silica figure itself. We derive it per sample, score it against the limit, and set the operator's injury rate against a benchmark built from the full MSHA operator record. With the 26-year penalty trail, contest posture, and fatality history. Delivered as a PDF with the underlying data as CSV.
The federal record itself stays free on this site. What costs money, and why.